Board Present: Steven
Schattman, Sharon Bobb, Patricia Batey, Jim Jones, John McNerney, Alfred Muller,
Jim Vuko
Others Present: ECA General
Manager Terry Lee, Legum & Norman Regional
Manager James Santos, representatives from Quality Air & consultant
on asbestos abatement
Highlights of the Meeting
HVAC
New problem: asbestos in the
drywall compound. To correct this problem before in wall HVAC can be installed,
test needs to be conducted ($25). If there is asbestos (high likelihood there
is), the area will have to be contained and repaired. This will cost about
$200-$300 per standing unit and take a day’s time.
Many people buying HVAC
units from Quality Air expressed discontent with the color of the grills on
their in wall units (brushed aluminum). At first QA said they could do nothing
to change the product but further discussion yielded effort on part of QA to
look into correcting the issue.
It was suggested that some HVACs
could have thermostats and valves replaced to extend the life of the existing
HVAC. Owners need to contact company of their choice to evaluate their HVAC.
Quality Air is one possible company for the work.
Question brought up about
the quality of air filter used in the HVAC. QA said they use the highest
quality (Merv 8)
WATER PUMP NOISE: Expectation is noise from water pump will be fixed by installation of
new holding tanks.
Board passed motion to change bylaw majority vote from 75% to
66.66%. Volunteers needed to help with this effort.
Building Links system suppose to aid in package delivery process but not in time for the full holiday
package load at front desk. Expect system up in mid December.
Hartman Design contract just signed.
Parking regulations enforcement still an issue.
Social Committee –Holiday party December 14 (7-9 pm)
Making a Difference—successful
hat and scarf sale (almost $800 received in sales) to fund Holiday box filling
for homeless.
Dec 6 – wrap and stuff boxes
for contribution to homeless.