Sunday, August 2, 2020

Summary of ECA Board Meeting July 29, 2020




Board Present: Lyle Schwartz (president), Zlatan Beca, Makarand (Mak) Dehejia, Francine Klein, Elisa Siegel, Christopher Wemple, Jimmy Whalen

Others Present: General Manager MaryAnn Hall(GM), Romaine Cureton, Assistant Manager (AM) Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer)

Meeting was called to order at 7:30 PM

President's Report: Board President, Lyle Schwartz, announced that an ECA “Renovation Planning in the Age of Covid-19” paper had been distributed to all residents. He stated that the Social Committee's Food Truck event had been highly successful. Residents, please fill out the survey and return it to the front desk by Sunday, August 2. The Annual Budget was well-developed but we cannot anticipate the impact of COVID19.

Important Dates:
-No Board Meeting in August
-August 26: “Meet the Candidates” night
-September 23: Annual Meeting followed by Board Meeting

Election of Board Candidates:
The Election Committee will distribute candidate information.
Owners will be able to vote one of three ways.
1.Vote by mail.
2. Vote on line.
3. Vote by placing your ballot in the black box outside the General Manager's office.

There was a correction of the previous meeting's minutes re the vote on a measure re:
the Fitness Center. This was resolved and the Board meeting moved on. Lyle asked C. Row to have the COVID 19 Task Force study and recommend ways to deal with the air handling issue. J. Boucher suggested moving the Fitness Center to a remodeled Management Office or to a remodeled Unit 10, the Association's rental unit.

 General Manager's Report

The GM reported that the new completion date for the garage project is August 20 and that she is working with CPR to reroute G1 exit traffic. The pool has reopened and one needs to sign up at the desk for a time to use it. Elevators 1 and 2 have passed reinspection. There have been 5 condensate leaks this year. In mid-August, the repair of the G1 entrance should address the condensate line leak.

NAC has completed cleaning, inspecting and performing routine maintenance of the boilers. As the office has resumed normal hours, the GM requests that all residents limit their interactions with the staff by using the telephone or email and set up appointments rather than “dropping in.”Maintenance staff will be working Monday through Friday and Ricardo and Barry will be on call Saturday and Sunday.

New Business:  Four Major Projects

1. Emergency Radio Antennas
Gathered prior to the COVID-19 shut down, information from 2 companies projected a budget item for this project at $190,000. The County modified specs and estimated cost now is $250,00, which the County has agreed to Grandfather in once the project is completed. Scheduling of work is dependent on availability of vendor with the project involving two to three technicians and taking two to three weeks. Ms. Hartman was consulted and presence of wiring in the corridor areas will minimal and aesthetically concealed.

2. Roof Renovations
Based on a written report submitted by Board-hired consultant who reviewed the project,
the roof renovation could be delayed 3 to 5 years as long as it is kept in good repair. While the FEA reserve study recommended that the two towers be repaired at separate times, the consultant suggested that the projects done simultaneously would result in significant savings.

3. Corridor Renovations
Phyllis Hartman has placed this project, due to commence in 2021, on hold due to COVID 19. That date is tentative and will depend on conditions at the time. The project is estimated to take 36 months and will be disruptive due to the number of workers and the type of work done.
E. Segal suggested that Ms. Hartman be advised to use American products in order to ensure  delivery.

4. Elevator Renovations
Board- appointed Elevator Committee comprised of GM and J. Boucher will search for an elevator consultant. All six elevators will need to be refurbished. Starting with those needing the
most repairs, one elevator in each tower will be down at the same time, along with one going to the garage. Repairs will take a few weeks to several months depending on their condition; they will be serviced by a few skilled technicians with much of the work being done above the elevator cab.

Meeting was adjourned at approximately 9:05 PM.