President’s Report
Circuit breakers—Each
individual owner will be responsible for a written inspection of their
electrical breaker box. Those who renovated their electrical can get that
report from their contractor. Building management will engagement a company to
do the inspection as the best price. Anticipated price would be $40-$50.
Failure to do the inspection will result in legal action by the Association.
Legal Counsel’s
Report
http://sos.maryland.gov/Documents/CondominiumBooklet.pdf
The Montgomery County Condominium Act as amended July 2017
now allows changes to bylaws as follows:
This change may help provide the option of imposing a special assessment.
Financial Report
The Elizabeth has now achieved FHA recertification, a
process that was initiated in June 2016. Based on the outstanding loan and
inadequate dollars in the reserve fund, FHA recertification was denied six
times.
Treasurer’s Report
Connie Row reported on this past week’s strategic planning
meetings and the products coming from those sessions, including a Strategic
Financial Plan.
General Manager’s
Report
Update on Unit #10:
The ECA General Manager interviewed five realtors. Three said rent the unit
because there are 20 units on the market for sale with 12 being one bedroom
units. Recommendation is to rent at this time the newly renovated unit at
approximately $2000 per month.
Failed Third Party
Elevator Inspection—six small items such as lights out in the pits caused
the Allstate Elevator inspection to fail. Otis has been called in to correct
the problems. Allstate will return for a second inspection once Otis completes
the work.
Cleaning Main Sewer
Lines—main sewer lines must be cleaned before hydro jetting cleaning can be
done in the riser stacks. The west side has presented a challenge since the
manhole cover is not close to our building as is the case with the east side.
There are only two companies in this area that have the equipment to do this
work. Proposals from these two are expected next week. This was not a budgeted
item and will be paid out of the Operating Contingency Fund.
The upright exercise
bike—a used bike in “great condition” has been purchase for $1800 versus a
new bike from RMS for $5200. The ECA Board President found this cheaper
alternative.
Garage Repair Project—because
of falling ceiling concrete and standing water, extensive work is required in
the garage. The entire project could cost over $1 million to complete. First
steps includes FEA drawing up the Scope of Work, selecting five bidders,
selection of the best bidder. The work would begin in March 2018. FEA recommends
completing the work in one phase by 2019.
New Business
Motions
—Adopt the Strategic Plan as revised: Approved by 5 board
members.
—Assess Lobby temperature problems: Approved by 5 board
members.
—Fix Main Entrance cracks: Approved by 5 board members.
—Replace pool filter and pump: Approved by 5 board members.
—Write Scope of Work to begin Garage Project: Approved by 5
board members.
—Snow removal services: Approved by 5 board members.
Work by ECA legal counsel Jeremy Tucker:
—Draft bylaw amendment for 60% approval of special
assessment: Approved by 5 board members.
—Draft bylaw amendment for changing Board Member terms from
3-4 to 2-2-3: Approved by 4 board members.
Special Report on
5550 Friendship Blvd Development
The developers of the property next door to The Elizabeth
want to build an 18-story building (condominium).
The consequence is two years of building and construction
noise. The building will block current views from Elizabeth apartments on the
East Side and may bring down property values. It will be harder to park on the
street in the neighborhood. Long term, there will be more noise amplified by
adding another high-rise building. This noise amplification is called the
canyon effect.
December 7, 2017, there will be a hearing. If you want to
voice your concern about this development project, it would be important to
attend this meeting. A decision will be made in spring 2018. These decisions are
heavily dependent on politics. Therefore, what you say can help stop the
project. [Details provided by Al
Muller.]