Wednesday, March 26, 2014

Summary of ECA Board Meeting March 24, 2014

Present: David Robinson, Ted Ariev, Jim Jones, McNerney, Alfred Muller, Steven Schattman, Jim Vuko

Others Present: ECA General Manager Terence Lee, ECA Assistant General Manager Wanda Powell, Senior Vice-President DC Metro Division Gregory Roby

Hallway Renovation.
Design Committee recommended that the Board proceed with Hartman Design Group.  

Fenestration Project
 The fenestration project (windows & balcony door replacement) moving slower than expected because of weather. Association advised not to engage workers in conversation but talk to management office for all questions.

ECA Staff Retirement
Calvin Allette submitted his resignation for April 9. His job will be taken care of by Clean Inc.

Problems Related to New Water Pumps
Water pump noise issue hopefully wrapped up.  Adjustments done Friday and Sunday have provided favorable results. Not sure the problem is totally resolved yet. Asked designer and installer to pay for third-party consultant work. We have backup pumps. It is a dual system where only one pump is supposed to work at a time. Cummings Wagner is responsible for the programming that was in error because all the pumps were working simultaneously.

Garage Fan & CO Detector Installation
Garage fans and CO (carbon monoxide) detector have been installed. They are running but we are waiting for inspection. Ted Ariev urges getting the inspection done pronto because of a CO incident in another condo.

Fan Coil Units 
Looked at Daikin (Daikin bought out McQuay Company, makers of ECA original fan coil units) unit favorably.

Elevator Pit & Sewage Problem
Sewage problem (leaking coupling) detected but it leaked into elevator pit. Under control now and has been cleaned and sanitized.

Elevator Problems
Elevator problem – Otis called but we had two entrapments. Control relays to elevators are outdated and require replacing. #3 West side culprit.  Over 100 relays but replacements are still the old 1986 technology. Emergency lighting didn’t work and emergency button didn’t work either.

Annual meeting is May 7 with four seats up for election.

Social Committee
Lecture on China or Korea in May or June by Jonathan Pollack.

Successful wine tasting party. Talk of doing this again.

Making A Difference Committee
Food collection Wednesday March 26 4-6 pm.

Peg Downey will conduct a class on knitting  & crocheting in party room a week from Wednesday. The committee has ample yarn supplies for use in the classes.

Renovation in the mail corridor in progress awaiting new molding.

Rentals in the Elizabeth
Restriction on rental units. Over 30% renters now. Discussion to create an amendment in time for annual meeting.  Problem is how to get enough owners to annual meeting. Need to lower voting quorum threshold first. 4620 N. Park had a hard time selling it to their Association. 

Proposed & Passed New Committee
A proposal by Jim Vuko: Participation Committee purpose to pursue long term strategies for getting people to bring folks together. E.g. hard to get 75% participation for changes to bylaws. Need a structural change. People need to be contacted on a regular basis.

Move for new committee. Passed by the Board.

Fiscal Draft Audit
Ariev said capital improvement needs revising.
Passed fiscal audit 2013 with two abstentions.

Pool Renovations
Major renovation work on pool upcoming.

Electrical Car Charging Station
Electrical car charging no movement at this time. Do a survey to find out who is interested.





Monday, March 10, 2014

Summary of ECA Board Meeting February 25, 2014


Board Present: Ted Ariev, Jim Jones,  Dr. Alfred Muller, Steven Schattman, Jim Vuko

Absent: Dr. David Robinson, John McNerney

Others Present: ECA General Manager Terrence Lee, Legum & Norman Regional Manager James Santos

Highlights from the February 25, 2014 meeting:

Presentation by Wiss Janney Elstner on windows & doors project.
The presentation was immediately turned over to:
They gave short presentation of key points including:

Security measures by team
(safety vests, signage and access ID badges)

Work activity overview:
Swing scaffolding
survey of existing wall condition
expterior repairs
window/door replacement
exterior wall & balcony
final closing

Estimated Start:
May-June units 07-09

Estimated End:
Nov-Dec units 03-06

Specific residence activities (4 days duration per unit):
--Balcony work
--initial inspection (one week before the work)
--one day for window/door installation

From the Management Report
--Fire Alarm System
----Phase I of Fire Alarm finished
----Phase II planned for 2016

--Water pump noise
----no noise suppression (couplings used)
---- couplings now installed
----Upcoming meeting with Cummns & Mendozo

--Fan Coil Program
----Not making recommendation for contractor only suggestions

Committee Reports
Design
--proposal for façade has been sent to the Board.

New Business
Design proposal
--Decision postponed (want all members present)
--survey to go out to residents

Comments
--question re: alarms in  units & how management knows alarms are working
--problems with arcade parking space (Bresler)
--fan coil demonstration requested
--water pump noise: management should not be tinkering with water pressure, should have a guarantee from contractor not instructions how to correct malfunction. Suggestion to ask Heath for opinion. If design plan is cause of noise might want to reconsider Mendoza as lead company for fan coil replacement program.


Thanks to Mary Catherine Curran for these notes.