Thursday, June 28, 2018

Summary of ECA Board Meeting June 26, 2018

Board Present: Makarand (Mak) Dehejia, Monique Fridell, Al Muller, Lyle Schwartz, Rhonda Taller, Christopher Wemple

Board Absent: Zlatan Beca

Others Present: ECA General Manager MaryAnn Hall, Assistant Manager Romaine Cureton, Jeremy Tucker (ECA legal counsel, Lerch Early & Brewer)

This summation will focus on highlights of the meeting. Mac Dehejia chaired this Board meeting.

Legal Report:

Legal counsel provided new information on building-wide non-smoking policies as is happening in other comparable Montgomery County, MD condominiums and co-ops (Grovesnor Park 2 & 3 and Promenade). The Board has directed him to draft new ECA rules to eliminate smoking in all common elements which include balconies and a new bylaw proposal to eliminate smoking in all units. The bylaw proposal was considered previously by the owners but did not pass. The rule proposal will be sent to all owners who will have 15 days to submit comments before the potential Board vote which is binding on the rule change. 

He will also draft the bylaw change which will be put to a vote by all owners.  It will include a grandfathering provision, which will likely have a town hall meeting about it before going to a positive vote of 60% of the total ownership in good standing to be approved. Another bylaw change be drafted for ownership consideration requiring owners to have insurance to cover damages not covered by the ECA master insurance policy as well as covering any required deductible if the damage starts in an individual unit. New Montgomery County law emphasizing that owners have adequate home-owners insurance to cover claims requires only a positive vote of 50% of the total ownership percentage. He said a new bylaw will be written to conform with new Montgomery County law emphasizing that owners have adequate home-owners insurance to cover claims.

Treasurer’s Report:

ECA Treasurer Lyle Schwartz reported that the Elizabeth is back on the desirable list regarding real estate sales and accessing mortgages and insurance. The Budget & Finance Committee has new leadership in Jimmy Whalen. The Committee is working on improving financial information packages to eliminate redundancy, improve clarity, and provide useful information to the Board for better decision-making. The Treasurer’s report, which is more detailed, will be accessible on BuildingLink.

Management Report:
Garage Project:
Step one (chain dragging, to find cement weakness that needs repair) will be completed June 28, 2018. Results show more work needed than expected on G-1 & G-4 but less work needed for G2 & G-3.

Step two (concrete repair) is expected to begin July 9. So far, our contractor CPR does not have the work permit needed from Montgomery County. CPR will use week of July 2 to bring in equipment and supplies.

Landscaping—Legend Landscaping will replace certain shrubs on the pool patio next week.

HVAC filters—Despite recent efforts to educate attendees in other monthly board meetings, the question continues to surface as to whether a suitable grade of HVAC filter is being supplied by the Association. The MERV 4 filters used by our maintenance staff is ideal for our purpose as long as they are changed every six months. Those wishing other MERV graded filter may choose to buy themselves and can get help from our staff in replacing the old filter at no charge.

Window washing—The window cleaners will return July 2-6 to correct any windows not properly washed this spring. The Fall window washing will take place November 1-2, 2018.

Fire Marshall Inspection—June 18 inspection was completed and passed. However, the Fire Marshall asked for: a door closer put on the Diving School door in the Arcade, trash chute door locks replacement on three different floors. Our GM is arranging meetings for Elizabeth residents to review what they should do when the fire alarm sounds and to ask questions.

More information may be seen in the June 26, 2018 Management Report which may be obtained in the office.

Communications Committee:
Celesta Jurkovich and Judy Gann are working on a review of existing Elizabeth rules on building-wide communications and use of public spaces in the building.  As a first step, they are surveying the policies of three other FH condos (4620, Carleton and Willoughby) to gather information about their experiences/rules on these topics.  The Carleton is also has begun reviewing their communication rules and their Board lead person on the project is interested in having ongoing contact.  They also use Building Link for communications.   
Gary Costello and Chris Wemple have also volunteered to get involved in the building communication issues, including restarting a regular newsletter for owners/residents.  However, to develop consensus concepts on each of these reviews and identify what is possible and practical for new initiatives, more Building owners and residents’ participation is needed.  It is likely these two projects will be split up as they move forward so volunteers can participate in whichever issue is of interest to them.   Anyone interested in participating in either of these reviews and research should contact Celesta Jurkovich, #1211 who is available at cjurkovich@verizon.net or 301-657-8134. 

Refurbishing Committee:

This group (Tobi Esler, Judy Gann, and Suzan Stafford) met to recommend immediate measures to spruce up the hallways. Five recommendations were made: replace chairs with benches (if there is a budget for a temporary fix), use uniform light bulbs throughout the property, repair wallpaper as needed, remove notices from tables, and procurement inexpensive centerpieces for these tables.

Other Items:

Car Charging Stations: The Board is again exploring the installation of electric car charging stations in the garage.  Information on the concept which was considered previously will be reviewed and costs involved will be determined as well how to charge those who would use such facilities


Owner Maintenance Requirements for HVAC Units: The Board also discussed distributing general information to all owners on appropriate unit owner maintenance requirements for HVAC units to avoid leak problems.