Board Present: Steven Schattman, Sharon Bobb, Patricia
Batey, Jim Jones, John McNerney, Alfred Muller, Jim Vuko
Others Present: ECA General Manager Terry Lee, Legum & Norman
Regional Manager JamesSantos
President’s Report:
We lost our neighbor Maurice Trebach. He did the original
research on our window project. He was a board member and a Village council
member.
Complaints about the windows. Pat Batey shadows the
contractors. Management is overseeing them but also the building. Major cause
of the complaints is the building itself. A lot of corners were cut and some of
that original shoddy work is coming to light now.
Treasurer:
Energy tax credits expired in 2013 and are not available at
this time. If Congress acts on this, the Association will be notified.
Management Report:
Problem with window installation in Tier 11: Muller suggests that if any aesthetic changes are to be made
in the building renovation projects, the entire Board should decide them. Tier
11 had problems on lower levels. Muller is asking that door handles be treated as they
were originally. It affects furniture. In this case, there will be 2 months to
reorder the doors that did not fit since no measurements was taken on the lower
floors of tier 11. Batey said putting all the door handles on same side gave us a
discount. Santos will investigate.
Noise from water pump now being discussed with Mendoza. Lee
can hear the noise at the lobby level as well as certain occupants of floor 3.
Building Links (computer system) loading Association member info. Will be
available first to general managers to test.
Parking regulations enforcement still an issue.
Design Committee—east hallway discussion available as
minutes in management office. Committee wants to purchase a bench for Library area.
Recommend that Hartman proposal be accepted.
Making a Difference—big success for linen collection.
Nov 13 & 14 – handmade hats/scarves sale and show
Nov 21—prebox party. Kids decorate the boxes.
Dec 6 – wrap and stuff boxes for contribution to homeless.
New Business:
Hartman Design requested an addendum to the contract. No
extra money. Muller and Bobb urge proceeding since we have good oversight with
Peg Downeys head of the Design Committee. Jim Santos praises Phyllis Hartman
and that certainly she will keep to the budget she is handed. She is a
professional. Motion passes with 5 in favor, 1 opposed, 1 abstention.
Keylink system for Key Control—
Need better key control. This motion was defeated earlier.
Schattman not convinced this is best answer. Batey says she has looked at other
system and others are more expensive and do the same the thing. Schattman
worried that keylink does not track who goes into an apartment. Muller says
this is not in the budget. It is $13K. Muller says this is out of order
according to Robert’s Rules. Motion passes 6 to 1.
Assistant Engineer to live in house.
Controversial – many association members want the assistant
engineer to be an ECA hire. Santos says we need a 21st century
approach where info is shared. We do not want a Jimmy Keating who had
institutional memory. Motion passes 4 to 3.