Dear Elizabethans,
There is a budget meeting today. It will be online:
B&F meeting, Mon. 3/23 at 6:30 pm
Conference dial-in number: 301-907-2801
Conference ID: 5
Conference password: 305018
The same call-in info will work for the Monthly Board meeting at 7:30 pm on Wednesday 3/25.
Hopefully, the Management Office will get BuildingLink updated with this info.
Today I saw that there were two trucks working on cleaning our sewers today. At least that is what I am guessing after reading what was written on the truck seen on the right. The other truck was passing a hose down an open manhole.
Let me know if you have issues you want to discuss, particularly as they concern our well being here at the Elizabeth. Email me at
karrenalenier @ gmail.com.
Monday, March 23, 2020
Saturday, March 7, 2020
Summary of ECA Board Meeting February 26, 2020
Board Present: Lyle Schwartz (president), Zlatan Beca, Elisa
Siegel, Christopher Wemple
Absent: : Makarand
(Mak) Dehejia, Jimmy Whalen
Others Present: General Manager MaryAnn
Hall, Assistant Manager Romaine Cureton, Jeremy Tucker (ECA Legal Counsel,
Lerch Early & Brewer)
Highlights of the meeting:
President’s Report:
—Garage Project: Coating and painting
of the garage floor began and initially there were noxious odors escaping up
the elevator shaft.
—Corridor Renovation: Hartman Group provided
updated estimates which were higher than the original bid (in approximately
2012) but within the expected current day target and our capital reserves can
cover the cost.
—Antennae and receivers for fire and
police communication: The cost for this project is $200,000. Once the contract
is approved, it will take one to two months to complete.
—Annual Meeting; set for May 6. The Election
Committee includes Connie Row, Deb Ryan, Linda Kuzmak, Bhaskaran
Balakrishnan, and Jim Jones. The call for nominations will go out
March 4. Deadline for board nominations is April 6. Meet the Candidates is
April 22.
Legal Report:
—There are two bills pending in the
Maryland General Assembly that may increase our personal expenses. The first bill would
double unit owner responsibility for the condominium’s insurance deductible
when damage to components of the condominium originates from a unit. Currently owners are responsible for the
first $5,000, but this bill will make owners responsible for the first $10,000.
The second bill would apply a 5% sales tax to services, e.g., legal, audit,
insurance, etc. This tax would be used to pay for Maryland State education
expenses.
—Expect a letter detailing what can be
held in storage.
Committee Reports:
Storage Committee:
The plan is to clear out the storage room in steps. First, hazardous materials. Next, furniture and carpets will be removed
from storage. Layo Fabunmi said, “The Committee
appreciates ideas that have been received on various approaches that can move
the project forward. Ideas are always welcomed.”
Financial
Report:
Jeremy Powell, our auditor with The
Goldklang Group, was expected to make a presentation on the draft audit, but
unfortunately fell ill. The Board plans to reschedule his appearance.
The Reserve Study is expected the end
of the first week in March.
Management
Report:
(You can request a copy from the
Management Office to get more details.)
Garage
Project:
The next phase has begun, i.e.,
coating and painting the garage. Cars will have to be moved and each segment of
the painting will take two weeks.
FHA
Recertification: The Elizabeth is approved for a three-year
recertification.
Pool
Renovation:
The General Manager reported
completion of the pool renovation that included resurfacing and coating of the
pool floor, replacement of some ceiling tiles, and the acquisition of new furniture.
Regular users of the pool
complained that the area under the steps that project into the shallow end of
the pool was not treated at all and appears black. They also said that things
collect under these stairs and that the stairs need refurbishing.
Additionally, it is unclear why
leaking problems that emanate from the 17th and 18th
floor washing machines cannot be fixed. Instead the General Manager said she
was ordering mold and mildew resistant tiles.
While the new pool furniture
looks nice, complaints were stated about the instability of the tables and how
the furniture was lightweight and not likely to last long.
In response to questions about
the new furniture, Jim Jones said that he and the General Manager selected the
new furniture.
Director Francine Klein has been
tapped to represent the Board on the next efforts related to the pool
renovation, e.g., selection of a mural and paint colors for the pool area.
Engineering
Emergency Services:
The concierge will be provided a
monthly schedule of which engineer is on call.
The Association purchased a cell phone for use by the engineer on
call. He will be expected to respond to
all resident calls within 15 minutes.
Crack
above G-1 Garage Entrance: Repair of the drywall, stucco and pipe
involved in this situation which has been noted months ago will not get
repaired until CPR (contractor working on the garage project) removes their
equipment that is located in the driveway. Scaffolding is required to make the
repair. The crack is getting larger but it was not stated when the CPR equipment
will be moved or who has determined whether there is a safety issue in waiting.
Motions: The
following motions were approved with unanimous votes.
—Prepayment of $150,000 on loan
—3-year pool contract renewal
for $50,496 per year
—Metal maintenance with Odyssey
Restoration for 8,580 yearly
—Stone maintenance with Odyssey
Restoration for 10.920 yearly
Note: Odyssey Restoration was
the contractor who originally maintained our floors and kept them in beautiful
shape. They will do marble maintenance monthly, including honing and polishing,
and will restore the grout? as well as train our cleaners for how to
effectively clean the floors on a regular basis.
Community Report:
There is some kind of parcel
redevelopment project brewing where Brooks Brothers and the Marriott are
located.
Comments from the Floor:
Ann Kasprzyk, a resident who uses the pool daily, provided a
list of concerns about the recent pool renovation and furniture acquisition.
She had contacted the Board president and the General Manager and stated that
her questions were not answered. Also, she expressed that her concerns about the
cleanliness of the pool (given the deplorable state of the steps and the lack
of attention to floor under these steps) and the safety issues regarding the
lightweight furniture were not adequately addressed. (Some of these issues were
addressed above in the management report.)
An addendum to the pool staircase: Ann & Daniel Kasprzyk
have filed this maintenance request:
Submitted by: Daniel Kasprzyk - Kasprzyk on 3/7/20 12:44 PM
Monday, February 17, 2020
The Pool Renovation
The Elizabeth indoor pool is one of the assets that makes this condominium unique and, for some, why they buy here. We just had renovations done there and everything should be now up to standards.
It’s time to have a look for yourself.
The new pool furniture is lightweight construction—both frame and mesh covering—and will not last. Is there any kind of warranty? Did the purchase
of this furniture go through the Design Committee for quality control? Does the Board understand the value of having a Design Committee investigate such purchases? Did the
entire Board approve this purchase? How much did it cost?
Some ceiling tiles have been replaced but the new tiles do
not match the old tiles. This is nothing more than an unacceptable patch job. Some
of the lattice-work that hold the tiles looks mangled. What about the rusted
pipe that isn’t covered over and the holes in the wall near the pipe? In order to replace all the ceiling tiles, the
pool needs to be drained.
Once the pool resurfacing occurred, the pool had to be
filled immediately to cure the job. This goes hand-in-glove with the first announcement
that the pool would reopen February 10. Management should have known that once
the pool was resurfaced, it would require a curing period which is why the pool
didn’t open until February 15.
The view from the front windows of the pool also reveals the
driveway overhang is in sad need of repair and painting. While this area that
needs fixing is not part of the pool renovation project, someone coming in to
look over the property for purchase would see this area from the pool deck and certainly
think that the property is run down.
Prices for our units continue to decline. This is a crisis. We need the Board to act to ensure the aesthetics and maintenance of the building are a priority.
Saturday, January 25, 2020
Summary of ECA Board Meeting January 22, 2020
Board Present: Lyle Schwartz (president), Zlatan Beca, Francine Klein, Makarand
(Mak) Dehejia, Elisa Siegel, Christopher Wemple
Absent: : Jimmy
Whalen
Others Present: General Manager MaryAnn
Hall, Assistant Manager Romaine Cureton, Jeremy Tucker (ECA Legal Counsel,
Lerch Early & Brewer)
Highlights of the meeting:
President’s Report:
—Garage Project: Latest projection is
that jackhammering ends February 7 but painting will go through the summer and
cars will have to be moved. There was an incident with unauthorized painting in
the garage, which damaged several cars. CPR is taking full responsibility.
—Corridor Renovation: Hartman Group has
put the project back on track since it was interrupted in 2012. The Board is
waiting for additional information from the Hartman Group. Further discussion
will occur at the February meeting. It was announced that the project cannot go
forward until CPR (of garage project) leaves the building.
—Roof resurfacing: Last time this was
done was over 16 years ago and now needs to be undertaken.
—Elevators: Are ok as is until 2022.
—Next Five Years: There is a need to
update FEA Reserve Study.
—Annual Meeting; set for May 6. The Nomination
Committee will be announced in February. People should start thinking about
running for the Board.
Management Report:
(You can request a copy from the
Management Office to get more details.)
Garage
Project: Three dates to note:
2/7 Jackhammering
ends
2/10 Painting begins
7/22 Projected completion of total project
FHA
Recertification: The Elizabeth is up for its three-year recertification.
The rules have changed and additional information is required including our
legally filed Amendment on No Smoking.
Pool
Renovation: Note these dates:
1/27 Pool closes for substantial repairs.
2/6 Pool reopens at usual Thursday schedule
Condo
Checks:
The Elizabeth’s Union Bank has
been experiencing processing issues and that has delayed condo fee payments
from some owners. Contact Management Office if you are charged a late fee
erroneously and the GM will reverse the fee.
Movement
of Management Box:
Without approval of the Board or the Design Committee,
the General Manager unilaterally decided to move the Management box from the
Business Center (where house copier is located) to the wall outside the
Management Office. Apparently, people were leaving cash and checks at the
concierge desk, and the rationale was that relocating the box was the
appropriate solution to that problem. The purpose as stated by the GM is to
better accommodate checks that have been dropped at the Concierge desk and then
misfiled.
The question then arises: why
was the location of the box identified as the cause of the problem? The problem
could have been solved simply and without cost to the Association by taking two
steps: (1) telling the concierge not to
accept checks or cash, but rather to refer people to the box in the Business
Center or the management office; (2) for management to send a communication on
BuildingLink and by memorandum to all owners/residents not to leave cash or
checks at concierge but instead to either mail checks in; take cash and checks to
the management office; or leave them in the box in the Business Center.
Acquisition
of Radio Antenna:
The Fire Marshal has cited the
Elizabeth for poor emergency responder radio coverage within the building. The
problem relates to new high-rise buildings causing signal interference
according to the Fire Marshall. The cost of equipment and installation which
affects every floor of both towers and the garage is between $188,000-$250,000.
The problem
is serious. Nonetheless, management or the Board should check with other
Friendship Heights buildings to see if they are experiencing the same problems.
Engineering
Emergency Services:
The General Manager reported: there
has always been a list at the concierge desk limiting after hours emergency
services, saying that the list was at the desk when she arrived. She claimed to be following Elizabeth policy
and that it was standard practice at all the condos.
All of the GM’s claims were
refuted either immediately or during the open comment period from the floor. Sharon
Bobb, a past president of the Board, offered background on what materials and training
MaryAnn Hall was given when she arrived here, including instructions that all
after-hours emergency calls are immediately passed through to the on-call
engineer. This has always been the policy and practice at the Elizabeth. Other residents who spoke confirmed her
comments. The bottom line is that if the GM found such a list at the concierge
desk when she arrived, she should have immediately alerted the Board and pulled
the list. Only the Board makes policy,
and all House Rules must be circulated among the residents for a 30-day comment
period, after which time they are discussed at an open Board meeting and voted
on by the Board.
Committee Reports:
Fitness
Center: Joe Bucherer provided a detailed
report on what changes and suggestions are being made in the Fitness Center to
improve the use of the space and the equipment. Painting within the
Center will be done at the same time as the pool painting is done.
Storage
Committee: Layo Fabunmi stated that the committee has been frustrated
in their attempts to make progress. The Committee had a meeting with the General Manager five months
ago. Action required of the GM was to obtain legal approval of a letter
she was to send out to the owners/
residents on actions the Committee would be taking. The first of such action
was to remove all flammable material from the storage. If the GM sent such a letter to
the attorney, why didn’t she follow up with him when there was no response? In
the meeting, our legal counsel said he received no such letter. The Committee
was also angry that the GM took credit in the Action Item List for work done by
the Committee.
Community Report:
Al Muller provided an unofficial
update on the closing of our Giant Store and the possibility that Amazon might
open some kind of lower cost grocery store other than Whole Foods. He said
there is still in effect a 40-year agreement with Chevy Chase Land Development
Company that requires a grocery store in that location and that some kind of
transportation to such a grocery store in the interim is their obligation as
was done in the late 1990s when that entire shopping center was undergoing
renovation. We might need to check with the Friendship Heights Village Center
to find out if there is transportation, possibly on the weekends, available now.
Comments from the Floor:
Engineering
Emergency Services: (Highlights)
—Peg Downey clarified that she was
specific about her emergency contact with the concierge that involved sewage
coming up in three locations in her bathroom, only to be told by the concierge
that she could either call for a plumber herself or wait (since she had more
than one bathroom) until the next business day. This is not to blame the
concierge who was only following orders from the GM. However, the concierge appeared
to have watered down the information passed to the on-call engineer, who
initially thought it was a problem that could wait.
—Pat Peyser shared some information
that she gathered from our neighboring buildings, regarding after-hours
emergency services. Two buildings, the Willoughby
and 4620, had live-in maintenance staff. Two did not, the Carlton uses contract
services, the resident contacts these services after hours. 4615 has two
non-resident staff on call; all calls are put through to the engineer by the concierge.
—Karren Alenier provided the Board (and
others assembled for the meeting) a statement from a past Board member who had
also been involved in training MaryAnn Hall about how to handle after-hours
emergencies. Ms. Alenier suggested that the solution to this problem was simple.
Just go to the Concierge desk and tear up the list regarding after-hours
emergencies. Because we never had a list
and the owners and residents do NOT want a list. They want access to the engineers, i.e., the concierge
gets in touch with the engineer when an owner/resident calls with an emergency
and the engineer immediately calls the resident/owner.
—General comments came from others as
well on this topic and the consensus was that if a resident called for
emergency help, help should be provided to ensure the safety, health and
quality of life for everyone. After all some problems may affect more than the
apartment of the caller.
Building
Maintenance:
Judy Gann who was a member of original Design
Committee pointed out that the building has deteriorated over the past 3 years.
There are various eyesores and problems in the building that are happening
under our current GM’s tenure.
—Movement of the Suggestion Box from
the Business Center (house copier room) to the wall outside the Management
Office was done without approval of the Design Committee. It’s an eyesore that
needs to be restored to the Business Center. It’s also unfortunate because it
will deplete our stock of expensive wallpaper purchased for emergencies.
—Recent signage around the building has
been done on the cheap and, in addition to inaccuracies in fire exit maps, does
not meet our overall design standards. Ms. Gann hopes that the “No Smoking”
signs will be more tasteful.
— Our beautiful marble floors that the
Hartman Group told us to keep when our lobby renovation was done, have been
given inadequate care by the unsatisfactory contractor who was hired three
years ago. Yet, this same contractor has been asked to provide a bid for
restoring them. We need to go back to the original contractor who kept our
floors in like-new condition.
—Furniture in our lobby needs regular
maintenance by a qualified contractor. Our lobby is looking shabby as we are
moving into the Hallway Renovation project.
— Overly large dogs are being allowed
into our building as well as owners with more than one dog, in violation of our
bylaws. What has happened with enforcing our bylaws and house rules, which is an
obligation of the GM?
Fire
Communications within the Elizabeth:
Pam Dillon, a past Board President,
asked if the Board has spoken with the Friendship Heights Village Counsel and
other condominiums around us about the Fire Marshall’s demand that we install a
roof radio antenna and repeaters throughout the towers and garage. She feels we
may learn something like the problem may be with the equipment the fire
department is using. What the fire department is asking for is very costly and
may not be the only solution.
ECA
Action Item List:
The addition of an action list to the Manager’s Report is
helpful. It is recommended that it include a dates due. The list should be closely monitored by the
Board to ensure that the actions reflect the priorities of the Board and the
condominium.
Wednesday, January 8, 2020
Emergency Engineering Services
WHEN DID THE ELIZABETH STOP HAVING WEEKEND & AFTER-HOURS
EMERGENCY ENGINEERING SERVICES?
Several residents have reported that they have been unable to get
assistance in the evening after normal work hours or on the weekend when they
have had problems in their units. They have been told by the Concierge
that there is no engineer available. Alternatively the Concierge has
said that he or she does not know who is on call and cannot get in touch with the
engineer, or that the engineer said he was not to be called, or that a stopped-up
toilet or sink is not an emergency if the complaining caller has a second bathroom.
I have also heard about and experienced instances when malfunctioning elevators
are not dealt with during after hours and weekends, but must wait until the next business day!
Recently an older resident who had weekend guests was told to call
an outside contractor when her toilet, tub, and shower spewed fecal
waste! Not only does this pose a health issue, but it could be a
symptom of a plumbing blockage in the tier all the way down to the street level
and thus have the potential of damaging many apartments and the common
areas.
Since its inception, The Elizabeth has provided emergency after-hours
services whenever they have been needed. It has been standard
practice when a resident called the Concierge to have the engineer call them
back within 10 minutes, and if necessary, go to the apartment and determine if
the service needed is immediate or could wait until the next business
day.
As a condition of their employment, our engineers are required to
live on site so that they are available to address all emergencies that arise
after the regular hours of work. This has always been one of the benefits of
living at the Elizabeth (as opposed to many other condos) and certainly makes
it a more desirable place to live.
To support this practice, we provide each engineer with a two-bedroom
two-bath unit and a parking space. This benefit alone is worth about
$30,000 per year to them and is not taxable.
As a matter of policy, the Elizabeth requires that our engineers
hold a third-class license. Using the concierge service to determine whether an
engineer can be called, or to refuse to call or identify who is on standby is
foolhardy, especially in an old building like ours with multiple problems. It
should not matter whether your problem is lack of heat or air conditioning, an
electrical issue, an elevator malfunction, a structural problem, odor of smoke,
or the like, and it should never be a matter of how many toilets or
sinks a resident has. All calls for engineering services should be responded to
within 10 minutes.
In 2014, significant damage to six apartments on two floors as
well as the common area corridors (costing the Association approximately
$220,000), was caused by a sewage backup in a toilet. It cost The
Elizabeth a great deal more since we almost lost our insurance after a second
large claim and had to go to the secondary market to get insurance.
Elizabeth policies can only be established by the Board, through a
process that includes discussion at open board meetings, and a 30-day comment
period for owners, followed by a vote by the Board of Directors. Elizabeth
policy cannot be arbitrarily changed.
If you are concerned by this arbitrary change in policy, please
come to the next Board meeting on Wednesday, January 22, 2020, at 7:30 pm and
let your concerns be heard.
Wednesday, November 27, 2019
Summary of ECA Board Meeting November 20, 2019
Board
Present: Lyle Schwartz (president), Zlatan Beca, Makarand (Mak) Dehejia, Elisa Siegel, Jimmy
Whalen
Absent: : Christopher Wemple
Others Present: Assistant Manager
Romaine Cureton, Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer),
Dan Watkins of FEA, Bill Martel of CPR
Highlights of the meeting:
The
primary focus of this meeting was the ongoing garage project.
It
began with a discussion of repair problems illustrated with extensive
slides of concrete problems and repair procedures.
The cost has increased dramatically from the original
estimate due to:
1.
Prior repairs were failing, and this was not
appreciated during the estimate. Prior repair procedures not documented. But
all old work was done from the bottom. Old patches used cement that was less
strong than original concrete, did not bond to rebar and did not bond to
original concrete. Thickness was 2 to 4 inches whereas CPR does not believe any
more than 2 inches of patch material should be used. Old patches failed when
concrete was hammered.
2.
Original estimates based on mostly “half depth”
repairs which expose the rebar by drilling from above and refills with fresh
concrete. However, old patches fell out of bottom requiring full depth repair.
Concrete also delaminated from vibration of nearby work.
3.
Rebar was more corroded than anticipated. [Rebar
are metal rods used to strengthen the concrete.]
4.
G4 floor proved to be in very poor condition.
Current estimate is that concrete repairs will be done by
end of January 2020 and corrosion and coating treatment completed by July 2020.
Comments:
From audience: On G4, the floor gets covered with water from
sump pump that spills out water. East corner by ramp shows fine cracks.
Apparently, these issues are not being addressed by the CPR contract.
Lyle Schwartz: There are numerous maintenance issues that
were not addressed in the past. The current board will setup a schedule for
routine maintenance and try to keep up with maintenance to prevent
deterioration. Sump pump needs to be investigated. Send issue to management.
Al Muller: Original time estimate was 6 months for
everything. Now it is 1.5 years for concrete repairs and 6 months for coating.
Obviously, something was wrong with original estimates.
Various audience members gave passionate speeches: failure to estimate is criminal, CPR and FEA
should be liable. Jeremey Tucker explained that this type of work involves
unknowns and the contracts specify rates for fixing problems as sound – not
fixed price bid. Lyle Schwartz acknowledged the original estimates were
inaccurate but added that one problem was that no one could anticipate the lack
of cooperation with moving cars and the delay this would cause. Elizabeth has
had to pay for towing. Owners are not reimbursing us. Also, the original
estimate did not include the corrosion treatment that the Board has approved
and feels necessary due to the degree of rebar corrosion found during the work.
CPR: concrete must be thoroughly cured before surface
treatment so once concrete repairs are done, we move all the cars again to do
the topside treatment.
8:45pm – representatives from CPR and FEA depart and
Schwartz and Tucker explained decision to negotiate contract adjustment. CPR is
taking losses due to the difficulties they have encountered plus an
inflationary increase in costs over the unanticipated long performance period.
CPR threatened to walk off the job if the Board not approve increased payment.
Board members were inclined to sue for breach of contract rather than pay.
However, Tucker and Chris Wemple did a careful estimate of costs which include
these factors: legal costs and cost of hiring a new contractor at what would be
today’s fully inflated rates. Lastly, it was not clear what kind of warranty we
would have if splitting the work between contractors. Tucker and Wemple
consulted the original bidders to obtain their current rates for repairs. With
these prices in mind, the Board entered into negotiation with CPR. CPR
compromised at a lower amount. The amount makes it about a wash whether we pay
or sue. Considering the uncertainties of legal action and the protracted delays
that finding, evaluating, and scheduling a different contractor would entail,
the Board agreed to pay. The payment will amount to about 3.6% increase over
contract cost. Exact amount is uncertain because we pay for each unit of work
as it is done at the negotiated rate. Nobody is happy about it but it is what
it is.
The
actual Board meeting began around 9 pm.
1.
GM Mary Ann Hall’s financial report first: she read
some bottom line figures from the available written report
2.
No legal report – Tucker passes
3.
GM’s management report – filter changes in
progress, moving cars for phase 12A
4.
Treasurer’s report prepared by Wemple but read
by Schwartz – main point: we will make a discretionary payment on the loan as
planned.
5.
Committee reports: Social- Dec. 14 holiday party,
Knitting group – planning a sale of knitted items, fitness group – no report today
but the committee will meet with board members in December. Newsletter –
deadline for content for next issue is las week of November.
No old business
No new business
Consult the Management Report ECA Action Item List for status/progress
on things requiring action.
Thursday, November 21, 2019
ECA Town Hall on Residential Hallway Renovation—November 14, 2019
My goal in this brief summary is to provide some highlights
of the Elizabeth Condominium Association Town Hall meeting held November 14, 2019.
For additional information, refer to the six-page document that went out to all
residents prior to the meeting and which was used during the event which
essentially was an opportunity for residents to express their comments and for
the ECA Board to collect information of which they were not previously aware.
The meeting was led by ECA president Lyle Schwartz with
several Board members in attendance including Zlatan Beca, Mak Dehijia, Francine
Klein, and Chris Wemple. Schwartz followed the document prepared by the Hartman
Design Group dated October 15, 2019, during which time the Hartman Group, the
Elizabeth Condominium design committee and the ECA Board of Directors discussed
the key design issues. Aspects of the project discussed included: carpet,
baseboards, door thresholds, hardware for new doors, lighting fixtures, walls,
crown molding, and special ceilings on designated floors that require special
treatment.
In 2012, this project was budgeted at $1.5 million. It is
not known at this time what labor and materials will cost. However, the baseline
established in 2012 indicates that hallway renovation is a big-ticket item. It should be noted that we no longer have the original story
boards that displayed sample colors and fabrics. These displays were destroyed during
the flood in the West Lobby.
An unexpected cost element surfaced with sobering effect when
we learned that fire and police officers cannot communicate in our building now
because the signal has been blocked by recently constructed tall buildings in
Bethesda. We are obligated to install an antennae on the roof and transmitters in
our hallways.
The Town Hall gathering may have been the best meeting this
community has ever held. The community members provided useful information in
the spirit of genuine concern to make this project successful. For example, one
aspect of the project which is controversial addresses whether the renovation
should address hallway walls with wall covering or paint. Resident comments
included the observation that what is under our current wall covering are walls
with uneven surfaces that are labor intensive to repair. This means remediation
will be extensive if the solution is to paint the walls.
Painted walls require constant repair and touch up given the
large number of move-ins and move-outs as well as deliveries and contractors
with bulky equipment. One possible method is to use a combination of wall
covering and painted walls. One of our issues affecting this decision is that
we are an older building with large pipes that could fail. There is no easy
solution. In the long run, painted walls are expensive to keep up. Commercial
grade wallpaper is more forgiving to things knocking against it. However, we
need to keep a supply of such wall coverings when repairs become necessary. This
is what we did with the current wall covering. The last wall coverings lasted
20 years, which is in keeping with when the next renovation should start.
The discussion about carpet surfaced a knowledgeable advisor
who lives among us. A.J. Young stated that the Axminster carpet chosen for the
lobby as well as the residential halls is 80% wool and will last many decades. Made
mostly of wool, this carpet withstands fire better than other fibers. Given the
bad flood experienced in the West Lobby, the carpet has already proven to be
very durable.
Replacement of our units’ hallway doors created a little
stir regarding metal versus wooden doors. One worry was about fire safety.
Apparently wooden doors are made with fire safety in mind. Our current metal doors
have often been made unsafe for fire protection by such actions as being adjusted
for carpet and additions of other locks and hardware.
What was surprising about the Hartman list of elements was no
inclusion of furniture as part of the design element. Apparently, Phyllis
Hartman has indicated to the Board that she needs to determine which selections from 2016 are
still available. Then alternative selections need to be priced. The Hartman
Group has purchasing power that will negotiate a best price.
Schwartz said the color scheme for the hallways will be
similar to the color scheme in the lobby and can be best seen in the renovated
hallway adjacent to the elevators in the West Lobby. He also said selections
for lighting have improved since 2016 and we will be able to take advantage of
the new LED options.





