THE ELIZABETH CONDOMINIUM ASSOCIATION
4601 North Park Avenue
Chevy Chase, MD 20815
Minutes of Board of Directors Meeting October 18, 2010
Board Present:
Alexandria Kielty
.........................President
Dr. Alfred Muller
.........................Vice President
Monique Fridell
...........................Treasurer
Molly Frantz
...............................Assistant Treasurer
Charles Bressler
...........................Director
Judith Barth
................................Director
Seth Levine
.................................Secretary
Others Present:
Scott Murdoch
...............Community Manager, Legum & Norman
James M. Santos
...........ECA General Manager
Jana Bowcut
.................Recording Secretary, On the Record
Walter Mendoza, PE
......Mendoza, Ribas, Farinas and Associates
Call to Order: Ms. Kielty called the meeting to order at 7:42 p.m.
Ms. Kielty called the meeting to order at 7:42 p.m.
Ms. Kielty introduced
Walter Mendoza, a mechanical engineer and founder of Mendoza, Ribas, Farinas and Associates to
discuss the firm’s
report which the Board commissioned
to analyze in greater detail the general recommendations of the 2009 Reserve Study, with particular focus on near term structural component replacement and energy conservation measures.
Mr. Mendoza provided an overview of the report, which covers the following:
1) A review of the Reserve Study.
2) A field inspection of building equipment to determine which equipment should be replaced between now and 2015.
3) Recommendations for energy savings and environmental impact.
4) A prioritization of the repairs with cost estimates of replacement of each piece of equipment (page 35).
5) A recommendation of the repairs and the sequence in which they should be conducted.
6) A review of the facilities maintenance program currently in place.
Mr. Mendoza summarized information from the report regarding the condition of building equipment and areas that will need attention over time. Many tasks will need additional professional engineering consultation before exact replacement costs can be determined.
Mr. Mendoza recommended beginning a program to
replace the windows as the current ones are not energy efficient. Dr. Muller inquired how the replacement would be done in phases in a cost effective manner. Mr. Mendoza recommended starting with the windows that would have the greatest return in energy savings, such as the ones on the west/northwest part of the building.
Ms. Fridell reminded the audience that the Board held a public workshop on August 24, 2010 to discuss the Mendoza Report and asked Mr. Mendoza to repeat for the benefit of this audience the emphasis the Report placed on the considerable near-term energy savings to be reaped by
replacing pumps in the building’s infrastructure. Mr. Mendoza explained that ECA’s existing pumps run 24-hours-a-day, regardless of whether water is running through them or not, which consumes a lot of energy. There is new technology available where pumps can be controlled to reduce the horsepower when water demand is low, resulting in immediate energy and cost savings.
A resident inquired how the universal
McQuay fan-coil unit replacement could be conducted. Mr. Mendoza stated that the project could be executed one tier at a time, starting at the top of the building and working down, or vice versa. He cannot develop an estimate for this work until the condition of the piping can be determined. Another resident asked if humidifiers could be added in units. Mr. Mendoza stated that they could, but they are prone to breaking, so they would have to be of good quality and therefore expensive. However, Mr. Mendoza added that once the windows are replaced, the interior air will be much more comfortable due to less air and temperature transfer between outside and inside conditions due to non-efficient single-pane windows currently in place.
A resident asked if the Mendoza Report will be available in the Management Office or on the website, to which Mr. Santos responded that it is already available in the Office.
Ms. Kielty thanked Mr. Mendoza and stated that the Association will continue to work with Mendoza Rebas in moving forward on a number of projects recommended by the firm.
Approval of Minutes:
MOTION Dr. Muller moved, Mr. Bressler seconded, to approve the September 20, 2010 regular meeting minutes as amended. The motion passed unanimously.
President’s Report: No report was given.
Treasurer’s Report: Ms. Fridell stated that Deleon & Stang (D&S) is preparing draft audited FY 2010 financial statements. The audit has been going smoothly, although D&S has identified some booking errors along the lines of those Ms. Fridell and Mr. Murdoch have been working each month to correct. D&S may choose to address this in its FY 2010 Management Letter to the Board.
Old Business:
Lobby renovation: Mr. Santos provided the following updates regarding the renovation:
• The final stages of detailing and touch-up painting are being done in the West Lobby. A walk-through with the designer and a meeting with the architect were held to discuss areas that need to be addressed.
• The tile floor in front of the front desk is not yet completed but is expected to be done within the next ten business days.
• All of the glass doors were delivered and installed, but did not meet the approved shop drawing specifications. This will be corrected at no cost to the Association, and the metal will not be cleaned and sealed until the changes are made. Different hardware with longer handles will be installed.
• The power door-opener controller is to be replaced on the East lobby wing door.
• Installation of the audio/visual equipment is about 99 percent complete. Verizon has been working to ensure everything is working correctly. There will be Fios WiFi capability for the business center.
• The FOB door access control program and additional security cameras are progressing toward completion.
• Lobby and Party Room furniture will not be delivered for several more months, as explained at the September 2010 Board Meeting.
Emergency Generator: Mr. Murdoch reported that approval for the amended air flow redesign was obtained from Montgomery County last week. The contractors have updated their bid information and the new cost estimate is $520,000, versus the original cost estimate $425,000. Installation should be completed within the next three weeks. Ms. Frantz asked how much this exceeds the budget for this item, to which Mr. Murdoch responded $50,000. Mr. Murdoch will provide the Board with a more detailed description of the contract change orders.
Website: Mr. Murdoch stated that all of the current resident data has been uploaded into the website. Mr. Levine stated that problems with logging on have been resolved, but if anyone is still having difficulty, they should contact him at “sgl@greatoaktitle.com”. The Mendoza Report has already been uploaded and can be found under “Resources” and then “Condo Documents.” More features will be available on-line in the next few weeks.
Cost Estimates: Ms. Frantz asked if there were any updates on cost estimates for the
balconies, doors, and fan coil McQuay units. Mr. Santos stated that he is working on this due diligence on an on-going basis and is preparing a master plan for all of the HVAC needs in the building, which would include all pumps, horizontal piping and fan coil McQuay units. He has obtained some cost estimates and is preparing Scopes of Work in order to be able to issue Requests For Proposals within a few months.
In the meantime, the Board has approved the installation/performance testing of a sample of a new, energy-efficient window in the Management Office.
Employee Group Health Insurance Renewal: Mr. Murdoch stated that the renewal was received from Kelly Associates showing a surprising less than two percent reduction in premiums with no changes to current benefit levels.
MOTION Dr. Muller moved, Ms. Frantz seconded, to
approve the renewal of the employee group health insurance plan with Blue Cross Blue Shield at a cost of $6,833 per month. The motion passed unanimously.
New Business:
Landscape Committee Recommendation: Committee Chairman, Jim Rich, reported that they had interviewed four landscape companies and had developed a comprehensive landscaping plan with three components: a master plan, implementation phase, and maintenance contract. The committee has identified Ruppert Landscape to create the master plan, but may not recommend using the same firm for implementation of the master plan. This vendor has done other work in the neighborhood and would charge $2,250 to develop the master plan.
Ms. Fridell stated that while she was pleased with the Committee’s due diligence and had no problem with its recommendation, she was concerned that only the Ruppert Landscape bid was provided in the Board package, and that no competitive information on other bids had been presented to the Board for its vote on the contract. Mr. Rich clarified that three bids had been obtained from Ruppert, Lasting Impressions and Merrifield, and the Committee will provide that information to the Board. Ms. Fridell reminded Board members and the audience that when the Board votes on contracts, there needs to be documentation supporting the fact that research was done on multiple vendors and that a competitive price/value proposition was selected.
Dr. Muller recommended that the Board vote on the landscaping design contract at the November Board Meeting when documented bid comparison could be presented. Mr. Santos will assist the Committee in preparing the proposal analysis and cost comparison.
Corridor Renovation Project Management: Ms. Barth stated that the Hartman Design Group and the construction general contractor, HBW Group, completed an extensive walk-through and suggested that the varying configurations of ECA’s tower hallways will be a challenge due to multiple short hallways and wall angles. The planning process is expected to be completed by February 2011, and the entire renovation process may take a full year because of the inability to seal off areas in an occupied building in order to install carpet, millwork or wall cover without interruption from pedestrian traffic. The general contractor proposes to work on three floors at a time, and could even alternate between floors in the East and West towers. Cost estimates have not been obtained yet, but they will be broken down into options so that the Board can choose the parts that are feasible and within budget.
Ms. Frantz inquired about opportunities for residents to participate in the renovation planning. Ms. Barth responded that planning is still in early stages. Ms. Kielty stated that there is a great deal of opportunity for input via the Renovation Committee and its advisory committee, and that residents may certainly express their opinions to Committee and/or Board members at any time during the process. Ms. Frantz stressed that formal opportunities for resident input need to be built into the beginning of the process rather than left to an informal, ad hoc basis. Ms. Barth reminded Board members and the audience that on March 9, 2010, Hartman Design Group made a public presentation of proposed design finishes and the committee received no negative feedback at that time. Dr. Muller suggested having one or more public meetings where residents can comment on hallway renovation design proposals, and then the Committee could convey these observations to Hartman Design Group.
Members of the Renovation Committee are: Judy Gann, Judi Barth, and Alexandra Kielty.
Members of the Advisory Committee are: Joan Rosenbach, Gerald Feldman, Barbara Smith, and Sharon Bobb.
Committee Reports:
Energy Conservation Committee: Chairwoman Joan Rosenbach reported the committee met on September 23, 2010. One item discussed was holding another Compact Fluorescent Lamp sale. The committee will work with Mr. Santos to obtain the best items and prices. Mrs. Rosenbach reminded the audience that the U.S. Department of Energy is offering rebates on purchases of Energy Star-rated appliances. Rebates are also available to residents through PEPCO. A flyer has been prepared with information on how to contact PEPCO and will be distributed in residents’ mailboxes.
Some residents have expressed concern about toilets leaking and causing damage or wasting water. With the help of Mr. Santos, the committee is researching water efficient models and expects to share options with residents for general information purposes. She reiterated that many McQuay fan coil units in the building are in need of repair/replacement. The Committee would like the Board to clarify whose responsibility McQuay unit replacement would be – individual owners or the Association. Ms. Frantz stated that the Board has asked Lerch Early, ECA’s external counsel, to provide a formal opinion on this based on a reading of ECA’s By-laws.
The Energy Committee consulted with the electrician from PowerServices about installing motion-sensitive lighting in various common areas such as the mailbox hallway, public restrooms and the Party Room. A resident stated that in her opinion, the bright lighting near the elevators was excessively wasteful from an energy perspective, and queried whether it was necessary. Once the contractors leave, the lights can be dimmed ; the Committee will inquire if this can be done immediately.
Mrs. Rosenbach also encouraged interested residents to consider joining the Energy Committee.
Floor Representative Committee: Co-Chairwoman Stephanie Olshan reported the committee met on October 8, 2010, with Mr. Santos to discuss the historical roles of floor representatives and to define their future roles. They also discussed the need to re-activate the move-in notification process with Management. The committee is developing a questionnaire for floor representatives to complete to measure the representatives desired level of participation in the Committee. Another meeting will be scheduled in the near future and the committee will report to the Board on a quarterly basis.
Ms. Kielty announced to residents that
Wanda Powell, the
new Assistant Manager, will begin working at ECA on November 1, 2010.
Contracts:
Ms. Fridell repeated to Management the Board’s previous requests that any/all contracts presented to the Board for a vote be included specifically on the Board Meeting Agenda.
MOTION Dr. Muller moved, Ms. Barth seconded, to
approve the Densel Company to perform the annual cleaning and analysis of the boilers for $7,592.00. The motion passed unanimously.
Mr. Santos proposed that the Board consider paying an additional fee to expedite receipt of Board Meeting minutes from the minute-taking firm, On the Record. Currently, the contract stipulates that the minutes will be received within ten business days. After discussion, Board members asked Mr. Santos to verify the cost of a guaranteed five-day return with On the Record.
MOTION Ms. Frantz moved, Ms. Fridell seconded, to
approve expediting receipt of meeting minutes within five business days, once Mr. Santos reaches an agreement with On the Record. This would be expected to cost below the $30 fee for return of draft minutes within three to nine business days. The motion passed unanimously.
Comments from Floor:
On behalf of the owner of unit 309, the tenants, presented an issue to the Board regarding
cigarette smoke/odors seeping into their unit. Despite having insulation and air filters replaced, the problem is unresolved. Both Mr. Santos and ECA Engineers have inspected the unit and have tried to identify nearby residents who may be smoking. The owner is committed to resolving the problem. Dr. Muller proposed consulting legal counsel about what actions ECA can take to protect the health of affected parties while respecting the legal right of owners to smoke inside their own apartments. .
A resident expressed her
negative opinion about the appearance of the new floor coverings in the elevators. Ms. Kielty stated that Renovation Committee members and many residents agree, and are considering options for improvement/change. A resident inquired about the proposal to install a piano in the West lobby. Ms. Kielty responded that no decision has been taken. The owner of unit 215 expressed at length her concerns about the quality of the elevator floor tile, common area lighting, new glass doors and the carpet selection in the party room.
A resident reported a smell of urine outside the door of the first floor exit to the East side mezzanine level. She expressed concern about future damage this could do to new hallway carpeting and suggested frequent washing of this area. Dog owners should be reminded not to allow their
dogs to urinate on common area premises.
A resident expressed concern about a recent
fire alarm, which was ultimately proven to be false, but which required him and other residents to walk down 14 flights of stairs. He asked if there was a mechanism by which residents could be notified immediately that the alarm is false before they begin evacuating the building via the stairs. Mr. Santos stated that such an announcement might not be heard over the sound of the alarm and that if residents were already in the stairwells, they definitely would not hear such an announcement.
A resident flagged a corner where two walls meet in the West lobby hallway that is already being repeatedly damaged and then repaired.
A resident asked why the Association cannot purchase more microphones for the Board Meetings. Mr. Santos responded that
audio/video enhancements will include overhead speakers and wireless microphones; he will ensure that there are plenty of microphones for everyone.
A resident expressed his opinion that white baseboards in some areas of the lobby will easily show scuff marks.
Mr. Bressler asked if more
lighting and artwork would be added on the East lobby. Ms. Barth responded that some additional lighting may be installed to showcase art. However, she explained that the corridors on East lobby are relatively narrow and art could be damaged by passing luggage carts. Dr. Muller commented that he had asked Hartman Design Group to prepare a set of art samples that could be considered “non-controversial” for presentation to the Renovation Committee. Ms. Barth stated that she intends to invite the Board to view the art samples.
Ms. Kielty reminded residents that Hartman Design Group is an award winning firm and that its cost-conscious design and extensive contractor relationships have enabled ECA to accomplish a more extensive renovation – including Party Room and public restrooms -- than the Board initially had estimated. Dr. Muller added that his experience with Hartman Design Group is that principals always react positively to suggestions. Mr. Bressler complimented the work done on the Party Room.
Residents complimented Mr. Santos on his excellent performance and his responsiveness in emergencies.
A resident inquired about the status of renovation plans for the
exercise room. Ms. Kielty responded that approximately $17,947 was approved by the Board as part of the 5-year reserve expenditure plan for FY 2008, for purchase of exercise equipment and that this expense is included in the current Five Year Plan . Robin Schattman, Jim Jones, Ms. Kielty and Ms. Fridell are serving on the exercise facility committee, which previously identified equipment from Heartline [vendor] to purchase; however, Ms. Fridell explained that these purchases were postponed because the Exercise Committee wanted to determine how much space would be available in the Exercise Room if it were renovated, and whether that could be done on a cost-effective basis. The Board approved $2,600 to be paid to Hartman Design Group for a preliminary design survey of the Exercise Room. Hartman delivered these designs in April 2010; however, no renovation action has been taken to date due to the projected expense and the fact that not much additional space could be gained from a redesign due to placement of mechanical equipment Ms. Kielty noted that additional equipment could still be purchased without any renovation and that the Exercise Committee could make such recommendations. Associa, L&N’s parent company, receives a 40 percent discount off the price of Heartline equipment , which might enable to purchase more/better equipment with the $17,947 budgeted amount.
A resident observed that the exercise room needs an exit sign. Mr. Santos will follow up.
Adjournment
The President adjourned the meeting at 10:32 p.m.
The initial draft of the minutes, upon which these minutes are based, was prepared by Jana Bowcut of On the Record.
Respectfully submitted,
_____________________________________
Charles Bressler, Board Secretary