Monday, December 23, 2013

Summary of ECA Board Meeting December 17, 2013


Board Present: Dr. David Robinson, Ted Ariev, Jim Jones, John McNerney, Dr. Alfred Muller, Steven Schattman, Jim Vuko

Others Present: ECA General Manager Terence Lee, Legum & Norman Regional Manager James Santos

Highlights from the December 17, 2013 meeting:

Minutes were amended to include issues about asbestos and window replacement at Mary Catherine Curran’s request.

Rita Miller raised issue about things brought up in comment period that were omitted from the official minutes.

Thanks to social committee for a successful holiday party.

New water project: The Elizabeth will have first ever filter on water coming into the building.

No meeting in January.

Management Report:
Received bids for fan coil replacement.

5th floor detectors for fire system has been replaced. It was causing alarm to go off.

Musak contract for broadcast on the floor corridors cancelled.

Jan 19 ice cream social
Feb is international dinner

Making a difference committee:
15 kids made wrapping paper in Nov
box party – 322 filled boxes delivered to SOME to help homeless.

Design Committee
Hartman coming back to do corridors?


OLD BUSINESS
Additional library shelving was a hot button issue where such issues and questions were raised: $6000 was not in the budget. Who uses the library?

Design Committee fears interference with the original design concept. 
Among arguments raised were that not many residents of The Elizabeth used the library but as pointed out not many residents use the pool and exercise rooms but all of these amenities add to the quality of life here at The Elizabeth.

Something I was unaware of: story hours for children are happening here in our library area. 

The request for funding additional shelving was denied by a 4 to 3 vote of the ECA Board.


Please feel free to tell me about details missed.  Also I did not get details from the November meeting and would be happy to receive and post info about that.



HAPPY HOLIDAYS!

Replacement of Windows & Balcony Doors

Here is the 2014 schedule for replacement of windows & balcony doors:


January -- complete/sign the contract

February -- stage the building for the project which includes balcony repairs

This means that scaffolding will be put up around the building and protection (covered) walkways will be installed on street level in various places around the building (similar to what you see at the Irene on Williard Ave).

The scaffolding and protection will be in place for as long as the project is in progress which is expected to be one year.

David Robinson provided this additional information:

Ken Kosteva of Wiss, Janney and Elster (WJE) preselected four general contractors with experience in the repair/replacement of building facades.  They were provided the statement of work with specifications and drawings.  They each responded with proposals and were interviewed by WJE personnel and members of the MR&R Committee.  Manganaro was selected as the best value, also the least expensive.  The Board of Directors voted to award the contract to them, and WJE with input from Ted Ariev is currently negotiating the contract for the Elizabeth.  We expect to have it signed before the end of the year.


The company that the contract is being worked out with will use 2-3 teams of workers.

They have not yet determined where the work will begin -- that is part of the contract negotiations underway now.

March -- work begins pending weather conditions.




Wednesday, October 30, 2013

Summary of October 22, 2013, ECA Board Meeting


Board Present: Dr. David Robinson, Ted Ariev, Jim Jones, John McNerney, Dr. Alfred Muller, Steven Schattman, Jim Vuko


Others Present: ECA General Manager Terence Lee, Legum & Norman Regional Manager James Santos, Legum & Norman Senior Vice-President DC Metro Division Gregory Robby

Topics of interest discussed in this meeting were:
windows/balcony door replacement issues
fitness room renovation
electric car docking station
smoking on balconies
landscaping

Windows/balcony door replacement issues. Two companies bidding on this job backed out of the competitive bidding and now more bids by new vendors are being sought. Some ECA members were concerned about how the new windows would open and what that opening, which is more in the middle of the window frame, would affect relative to items in individual apartments. 

Fitness room renovation. Generally speaking a number of people voiced dismay about how well the renovation of the fitness room was done. Santos said that the company has a good reputation and he would contact them to review the work.

Electric car docking station. There are tax benefits for establishing a such a station for re-charging electric cars but who pays for the installation. More questions at this time than answers.

Smoking on balconies. This continues to be a problem for certain residents but no general solutions are on the table. 

Landscaping. Fall planting is underway.

Friday, September 27, 2013

Summary of September 24, 2013, ECA Board Meeting


Summary of September 24, 2013, ECA Board Meeting


Board Present: Dr. David Robinson, Ted Ariev, Jim Jones, John McNerney, Dr. Alfred Muller, Steven Schattman, Jim Vuko

Others Present: ECA General Manager Terence Lee, Legum & Norman Community Manager James Santos


One of the most important items discussed was a tentative schedule for balcony repair & window/balcony door replacement. The earliest this project could start would January but realistically work might not start until March. Most likely the work will begin with north facing tiers.

Smoking on balconies, smoking within individual apartments, and the smoking survey was discussed but not acted on. Dr. Muller served as an advocate for banning smoking. He made various motions which were not supported by any other board members so the smoking issue fell by the wayside.

At least one board member requested follow up by our general manager on several issues that included docking stations for electric cars and parking policies.

Various projects are underway or completed in the building that included installation of roof anchors, new water meter and various repairs including work on the sump and ejector system.

The new website for the Elizabeth has approved minutes of the ECA board. To see these minutes you must register with your Legum & Norman account number. If you don't know your account number, contact assistant manager Wanda Powell. Once registered and logged on: look for a drop down box on the left-hand side of the screen that reads "All Document." Click that box to get a menu of documents, which includes "Minutes." The minutes are organized by month in PDF format.

Thursday, August 29, 2013


Summary of August 27, 2013, ECA Board Meeting


Board Present: Dr. David Robinson, Ted Ariev, Jim Jones, John McNerney, Dr. Alfred Muller, Steven Schattman, Jim Vuko



The most important item discussed at this meeting was the loan that has been decided on which will finance all the major improvements including replacement of windows, balcony doors and balcony repairs.

The cost of the loan over an 8 year period will be $600,000. The first three years of the loan when payments are made it will only go to interest payment. The loan is 3.9%.

Reserve funds will be drawn down before loan funding is used.

Another item of interest was the request from an ECA owner to establish electric car charging stations which cost between $700-$1200. Various ideas were suggested about where to put the docking stations and how they could accommodate owners of electric cars.

Tuesday, July 30, 2013

ECA Board Minutes June 25, 2013


THE ELIZABETH CONDOMINIUM ASSOCIATION
4601 North Park Avenue
Chevy Chase, MD 20815

 Minutes of the Board of Directors Meeting, June 25, 2013 

Board Present:
David Robinson               President
Steven Schattman............Vice-President
Jim Vuko.........................Secretary
Ted Ariev .......................Director.
Alfred Muller        ...        Director

Board Absent:
Jim Jones.......................  Director...
John McNerney ............  Treasurer

Others Present:
Gregory Roby ..............   Senior Vice-President, Legum & Norman
James M. Santos ..............ECA General Manager, Legum & Norman
 Jana Bowcut Recording Secretary, On the Record

On May 28 and 29 2013, and June 12 and 18, 2013, in accordance with Section 11.109.1 of the Maryland Condominium Act, the Board met in executive session to conduct personnel and legal issues.

Call to Order: Dr. Robinson called the meeting to order at 7:36 p.m.

Approval of Meeting Minutes:
MOTION       Mr. Schattman moved, Mr. Vuko seconded that the amended minutes of the meeting of the board of directors on May 28, 2013 be approved. The motion passed with all in favor (5-0-0). 

President’s Report: Dr. Robinson reported that this meeting is the last of the fiscal year. He also thanked Mary Catherine Curran and James Jones for accepting committee responsibility to help Management coordinate cleaning of the storage rooms.

Treasurer’s Report: The following report was provided by Mr. McNerney prior to the meeting:

The amounts included herein are rounded to the nearest $1,000.

·      As of May 31, the Association had $3,066,000 in cash and investments, a decrease of $26,000 from the prior month.

·      The Replacement Reserve Fund at the end of May was $2,663,000, a decrease of $26,000 from the prior month.

·      Expenditures from the Reserve Fund in May totaled $31,000. The amount expended from that fund so far this fiscal year is $465,000.

·      Delinquencies through the end of May were $80,000, an increase of $4,000 from the prior month. Five accounts are in collection, including one that is in bankruptcy.

·      Five Certificates of Deposit (CDs) in the total amount $975,000 matured in early June. $750,000 of that was reinvested in short-term (three months or less) CDs in anticipation of the need for those funds later this year for Maintenance, Repair and Replacement program.

·      Management has solicited line of credit proposals from four lending sources. They have received two proposals. The leading candidate has been provided additional information necessary to prepare loan documents, which should be ready for review by the Association’s lawyers for presentation to the Board within the next several weeks.

·      The final audit by DeLeon and Stang for FY2012 was delivered to the Association on June 21. Copies are available in the management office.


Copies of the Balance Sheet and Statement of Income and Expenses as of May 31 will be available at the front desk.

Management Report: Mr. Santos reported on the following:
·      Current work order delinquencies total $907.50, of which $551.00 is at or greater than 60 days.
·      The final audit was just received, and hard copies are available in the management office. Owners may also have a PDF version e-mailed to them if requested.

·      The arcade canopy work is about 90 percent complete; metal coping along the top and lettering are still needed. The west garage demolition is complete.

·      The Maintenance Repair & Replacement program is progressing with upcoming work on the roof anchors, chiller, sewage ejector/sump pumps, roof ventilation and duct cleaning. Mr. Santos is concerned about interruption of A/C during the day and a temporary pump may be needed to maintain it. Work on the sewage injection and sump pumps will begin in July. Roof ventilation and duct cleaning work is ongoing.

·      A new electricity-provider contract for January 1, 2014 is being prepared. Suppliers are providing information to a third party, who will do the analysis and will present its recommendation in July. The Association’s current contract is a two-year contract, but a new one could be for one, two, or three years.

·      47 condominium owners have signed up for the fan coil replacement plan. Management can begin getting specifications for prices. Dr. Muller asked whether once the initial estimates are received, additional owners could decide to participate. Mr. Santos responded “yes” and he will advertise the information when it is available.

·      Dr. Muller inquired why the stairway signage project has been on hold for a while. Mr. Santos stated that is an expense that was not budgeted for until 2014.

Committee Reports:
Website: Mr. Schattman reported that he is currently leading work on the website, and will have some help from an additional staff member in the office. As of yesterday, only 16 residents had signed up for the website, and he encouraged more residents to participate. Those who were registered on the previous site are not automatically registered on the new one. Mr. Schattman requested that the office distribute a flier with the website address. Owners will need their Legum & Norman account number to register and will need to create a password. Information on upcoming events from committee chairmen should be given to the office so they can be entered onto the calendar. The website will be a valuable tool as it will hold documents of the Association, will be able to process work orders, and communicate with residents.

Library: A donation from Irene Ladwig provided the library with about 100 books of art and travel. Ms. Ladwig’s niece, Connie Hartsfield, was thanked in obtaining the donation. The committee requests that residents not donate any more books since there is no more space for them.

Social Committee: The cookbook compiled from the Food Fest will be ready within a week and will be distributed to the donors and the workers. The remaining will be in the Management office and will be available on a first-come, first-served basis. The committee thanked all those who were involved.

Old Business:
Mr. Santos provided an update on options for the wireless microphone system. At the previous board meeting, after presenting a proposal for an $11-12,000 system, Mr. Santos was asked to seek more options. Another option that would replace 10 microphones with antennas on the ceiling, would cost $9,086. If board members shared microphones, and only five microphones were purchased, the cost would be $6,866. Mr. Ariev asked about the life expectancy of a new system. Mr. Santos was unsure and will get some specifications on this.  

New Business:
1. Garage ventilation fan replacement: As part of the Maintenance, Repair and Replacement plan, improvements to the garage ventilation system were suggested. A bid from the Densel Company was received to replace the current 16 garage fans with 8 energy efficient fans, which will be connected to an automatic timer to run at varying speeds throughout the day. A Carbon Monoxide detection system was not included in the proposal, but is still being considered. The amount budgeted for this work is $108,000.

MOTION       Dr. Muller moved, Mr. Schattman seconded to approve the proposal from the Densel Company to install 8 new energy efficient garage fans on levels G1-G4  at a cost of $117,094.60. The motion passed all in favor (5-0-0).

2. City water pump/filtration: Of the three water pumps that are involved in this system, two of them are original, and the third is 16 years old. The equipment is in various degrees of corrosion, and some valves cannot be closed or isolated. Originally, only two pumps were recommended for replacement now (the third in several years), however, Mr. Santos recommended replacing the third pump as a replacement was found that would be at a lower cost than if purchased later, and the contractor can more easily install it while replacing the other pumps.

Dr. Muller expressed concern that only $133,000 was budgeted for this work, and adding the additional work puts the Association about $100,000 over budget, and the report did not state that a new pump was needed. Mr. Ariev responded that by doing the work now will help the Association to save money in the long run. Dr. Robinson stated that throughout the program, there will be other opportunities where it will make sense to do unplanned work that will be the best value for the Association. Mr. Schattman agreed that it does not make sense to disconnect everything twice.

Comments from the floor were invited. One resident expressed that incurring this cost now ignores the budget and the ten-year plan. Another resident inquired what the expected life of the third pump is. Mr. Santos responded that it should last another nine or 10 years. A question was also asked whether the Board sees whether this might affect future condominium fees. Mr. Ariev stated that contingency funds are built into the program to cover this. Dr. Muller was concerned that this fund was being used incorrectly and should be reserved for when there is unexpected cost with the work, not doing additional items earlier than planned.

MOTION       Mr. Ariev moved, Mr. Vuko seconded to approve the proposal from Noyes Air Conditioning, Inc. to replace the city water pump/filtration system for $235,140.00. The motion passed with Dr. Robinson, Mr. Schattman and Mr. Ariev in favor, and Dr. Muller and Mr. Vuko opposed (3-2-0).  

3. Garage Concrete Membrane Repairs/Resurfacing: This work is proposed for the turn areas of levels G1 to G3 and the entrance ramps for both entrances. Mr. Santos stated that this scope of work includes the turn areas were the surface receives the most wear. This work is necessary to prevent expensive damage to the concrete.

MOTION       Dr. Muller moved, Mr. Ariev seconded to accept the engineer’s (Wiss, Janney Elstner Associates, Inc.) recommendation of Choice Restoration Services, Inc. for performing concrete membrane repairs and resurfacing (G-1 to G-3) for the amount of $21,754.00. The motion passed unanimously (5-0-0).

4. Fire Alarm System Upgrades: This work includes the replacement of the main control panel and pull stations on floors. Bids received so far are not similar in scope, and prices are too far apart. Mr. Santos has been working with the contractors and the engineer to make the bids comparable. This should be done within the next seven days. Dr. Muller inquired if a signed agreement was received from the fire department, to which Mr. Santos responded that it has. This agreement gives the Association five years to upgrade its equipment. $300,000 is budgeted for Phase 1 and 2.

5. 2014 Capital Improvement Plan: Mr. Santos stated that he has a list of additional improvements that he would like to recommend in the coming fiscal year. This includes improvements to the fitness area, computer upgrades and doors needing replacement. The items on the list cost an estimated $118,000; the list was provided to the treasurer and finance committee during the FY2014 budget preparation. Dr. Muller expressed concern that the contingency fund is for unexpected costs, not additional items. He added that the engineering consultants did not indicate any of these suggested things and new projects should not be considered. Dr. Robinson stated there will always be additional needs that cannot be budgeted for. Mr. Santos added that these capital improvement items are projects for daily operations and outside the Maintenance Repair & Replacement projects.

Resident Comments:
Rita Miller, Unit #607, stated that the pool water is cloudy. Mr. Santos stated that the cloudiness is due to an imbalance of chemicals used to treat the water and Winkler Management assured him that it had been fixed. The resident stated that it has not been fixed and has been a problem from Friday through today. Mr. Santos stated that he has told the owner of Winkler Management that performance has been substandard and this will be put in writing in the July management report.

Alexandra Kielty, Unit #1121, stated that the door leading to the arcade from the elevator lobby is difficult to open and is getting worse. Mr. Santos will inspect the door. Ms. Kielty also asked about the impact the HVAC replacement will have to residents located in the same tier. Mr. Santos stated that it will not impact those residents above or below.

Pam Dillon, Unit #718, stated that the correction to the budget discussed in last month’s meeting has not been corrected. She is concerned that the Board is not running the Association in a financially sound way.

A resident requested that a group be convened to address questions regarding the fan coil replacement project. Mr. Santos stated that prices should be obtained first, and then an information session can be planned.

Judi Barth, Unit #209, suggested that the contractor supplying the fan coil units could bring in a unit to show to residents and brief them before any decisions are made. Ms. Barth also asked if the concrete work will fix the flooding that occurs on the G-2 level of the garage. Mr. Santos stated that the approved work is for the surface only, and the engineer is working on a solution, which involves the help of PEPCO. Ms. Barth also requested that the holes in the West garage wall be fixed.

Residents expressed concern about items littering a wall on the G-2 level, cars stored by people who do not own a condo. Mr. Santos stated that notice will be given to violators.

Adjournment: The President adjourned the meeting at 9:17p.m., with the Board to meet immediately after for an executive session, in concordance with section 11.109.1 of the Maryland Condominium Act.

The initial draft of the minutes, upon which these minutes are based, was prepared by Jana Bowcut of On the Record.

Respectfully submitted,
_____________________________________
Jim Vuko, Board Secretary

Monday, July 29, 2013

Summary of July 25, 2013, ECA Board Meeting


Board Present: Dr. David Robinson, Jim Jones, John McNerney, Dr. Alfred Muller, Steven Schattman, Jim Vuko

Board Absent:  Ted Ariev

President’s Report

Management: Jim Santos has been promoted to Legum & Norman Regional Director. Terence Lee is the new ECA General Manager. The ECA Board reviewed many applications before selecting Mr. Lee.
  
New members appointed to the Budget Committee (John, McNerney, Woody Cunningham, Peg Downey, Jerry Feldman, Joe Salcetti, and one more) and the Design Control Committee. New members invited to work with other committees.

Mail Box Hall: new design under consideration due to damage caused by congestion in the hallway.

Committees

Social Committee now headed by Judy Gann and Linda Robinson. Deborah Ariev resigned. Social events planned include: Halloween party, Winter Holiday Party, reception for Annual Meeting in May,  Spring picnic. Other events may be added if volunteers come forth.

Old Business

n  Archive canopy repair completed.
n  Storage space clean up nearly done.
n  Cleaning of Ducts and fans almost completed.

New Business
--Fire alarm agreement with Montgomery County done. As part of the new fire alarm system, cameras will be installed on each floor.
--Carbon monoxide detection system is now tied to a new ventilation system for all garage levels.
--An improved system for roof anchors was agreed upon, with an additional eight anchors need,
--3 new Dell computers for management office will replace the the two extant computers that are ten years old.
--61 owners are interested in exploring purchase of new fan coil units. Price will soon be available.

--Two treadmills need repair, parts are ordered.

Comments from Floor
--Smoking on Balconies, information offered about 8101 Connecticut Ave that have a ban on smoking contrary to our legal advice.
--Some issues with pool staff, especially in the evenings. Management will contact pool management company.
--Parking on G1—commercial units have been given access to guest parking at no cost in accordance with house rules.
--Eco Beco will return for more energy savings.
--Issues with renters who improperly dispose of unwanted items. Can owners be fined? Can renters be given orientation about use of trash rooms, recycling, disposal of unwanted items.