Board Present: Sharon Bobb, Patricia Batey,
Clifford Cohen, Peg Downey, Jim Jones, John McNerney, Steven Schattman
Others Present: ECA General Manager Terry Lee, ECA Assistant General
Manager Wanda Powell, ECA Legal Counsel Jason Fisher
Meeting preceded by wine and cheese
Opened with President’s report:
· Ruptured
Heat Line: The heat line from the boiler (not the
domestic water line) located in a common space located above the ceiling in
unit 1814 (East tower) ruptured December 1, 2015. This space provides for the
common plumbing and mechanical distribution to the risers. The pipe has been repaired, but several
apartments were damaged.
· Board process of selecting new Management Company: The
Board met in Closed Session on Nov 2, 3, 10, 11, and 12, to interview, and to
discuss the results of our vetting. At
the November 17 meeting, the Board unanimously selected Gates Hudson Community
Management as the new professional property management company. As part of that decision, all staff will be
employed directly by the Elizabeth Condominium Association: General Manager,
Assistant General Manager, and Chief Engineer will join Hollis, Marcel, Kevin
and Bouchra as our employees. The Board believes this is in the best interests
of the Elizabeth owners and residents.
· Gates Hudson Community Management will
begin work here on February 1, 2016, and Legum &
Norman will remain on staff until that time.
In the interim, Gates Hudson will be working on the transition. Owners
and residents can expect to hear from Gates Hudson prior to February 1.
· The
Secured Access System of the
building and property (the system that controls the key fobs) failed and on Nov
12 meeting, the Board unanimously approved the proposal from Electronic
Security Services, Inc. to replace the software control panels for
$26,720.
· Pool Temperature:
the October Conversation with the Board was dedicated entirely to pool
temperature and hours. The Board has
authorized a survey to all residents, and non-resident owners. Board President, Sharon Bobb suggested that
Management should handle this matter in coordination with interested residents
and our pool contractor, Winkler. The
survey results will be turned over to our new Management staff, and it will be
our new Management’s responsibility to work with all interested parties toward a
solution.
· Library Bench:
A new bench has been installed in the library, with attractive baskets
underneath for children’s books, returned books, and new book donations.
· Card Tables Alteration:
In response to complaint that the tables in the card room are too high. Phyllis
Hartman worked with the Design Committee and our furniture repairman, Bob
Licurgo, to lower the tables several inches.
Partial list
of accomplishments for the year:
·
KeyLink was installed and all emergency keys and keys
for recurring visitors were loaded
·
Approved
attendance at Board meetings via electronic media.
·
Established Conversations
with the Board, an open monthly forum for residents to speak directly
with Board members about any and all matters of concern, without time
constraints
·
Established a Committee
for the Competitive Recruitment of a Property Management firm.
·
The agendas for
our monthly meetings are more transparent and in greater detail.
·
Approved the
purchase of a new bench for the Library .
·
Approved a Board
of Directors Code of Professional Ethics
·
Approved draft
Elections Policy and Procedures to amend the House Rules for comment by the owners.
·
Approved proposed
amendment to the House Rules (4.D.1.a.) regarding increasing Moving Fees which would bring the
Elizabeth more in line with neighboring buildings.
·
Arranged for the
Mayor of Friendship Heights to be a guest speaker at the July Board meeting
·
Arranged for Robin
Manougian, our insurance agent, to
make a presentation at a Town Hall meeting July 23 to discuss insurance coverages, claims, and
the coverages owners need to carry.
·
Arranged a Town
Hall Meeting October 6 to educate our community regarding concerns for pipes in
aging buildings, and the methods available for sealing domestic water pipes
·
Arranged two Town
Hall Meetings to discuss the Request for Proposal (RFP) for a Property
Management firm so that the community could share its thoughts with the Board.
·
Approved
replacement of the original fire pump to comply with a county requirement
·
Approved the
proposal from Wiss, Janney, Elsner Associates to complete a review of the interstitial
spaces incident to the Fitness Center and the indoor pool for evidence of
distress, uncontrolled water penetration/leakage and evidence of microbial
growth.
·
Approved a motion
to contract with an engineering consulting firm to conduct a study focusing on
mechanical, electrical and plumbing (MEP) equipment and operations in order to
address leaks and other water-related damage .
·
Approved
AmeriClean to clean common area ducts
·
Approved the
purchase of notepads for the engineering and maintenance staff.
·
Appointed a Smoking
Exploratory Committee to gather information on the issues surrounding
second-hand smoking in a residential high-rise building and approved a survey
questionnaire for issuance to all owners.
·
Appointed Barbara
Pollack, as a Committee of One, to research the issue of condominium fees in
the Friendship Heights neighborhood. She
reported her findings to the Board and the community at a Board meeting, and
issued statistical findings that show that the Elizabeth is “in the ballpark”
when it comes to condo fees – not the highest nor the lowest in the
neighborhood.
· Lerch Early & Brewer Legal Report. Jason
Fisher discussed Election Rules and Procedures and distributed a marked-up copy
showing the proposed changes as a result of member comments on the previous
Rules and Procedures.
· Resident Comments: Discussion of Holiday fund distribution
proposal.
Treasurer’s
report
· Management Report: Further discussion of the burst
hot water pipe.
· Peg Downey reported that the design committee
had determined that replacing the existing doors with wooden doors, trimmed to
shape in each doorway was least likely to result in damage to resident
apartments during the renovation project. The question of whether the
thresholds would be modified to be flat, as they had in the west lobby area was
raised.
· After the book give-away, which took place
before and after the board meeting, the remaining books would be given to an
organization that assists veterans.
Old Biz: Motion to amend the House Rules to
raise the move-in/ move-out elevator
usage fee to $500 for moving in and $200 for moving out ($75 refundable if
no damage) to be more in line with other buildings. Motion amended to specify that
owners would be responsible in the event that a renter failed to pay.
New Biz: Motion to approve the completion of
Phase II of the Fire Alarm installation
$220,295. This is a project that must be completed. There was discussion about
the installation of Strobe Lights in the hallways to comply with ADA
specifications. Some people mentioned that Strobe Lights can cause seizures
among those who have epilepsy, but there is no choice in the matter.
Motion to approve WJE to develop exterior restoration design for main
entrance, including new canopy for $40,000, with a $3,000 expense
allowance. There was an objection to
sole bidding and questions about why the work should be done now when it is not
scheduled until 2019 in the plan. Motion was tabled.
Thanks to Jackie Lapidus for taking these
notes!
No comments:
Post a Comment