Monday, January 16, 2012

Notes from Informal Discussion with ECA Board Jan 15 2012


Present: Ilo-Mai Harding, Alfred Muller, and David Robinson.

About 30 people attended the gathering.

Main Topic of Discussion: Capital Improvement Project and activities building on the existing Mendoza Report.

David Robinson is working with Ted Ariev to organize and prioritize the numerous critical projects the ECA is faced with. Ariev’s guiding principles for prioritization are as follows:
#1 Safety
#2 Health
#3 Quality of life

Safety addressed government standards that the Association must meet including electrical issues and fire regulations. The discussion pointed out that we have no sprinkler system and the only condo building in the neighborhood that does is the Carlton, which is new enough to have had that featured required and therefore built in. Also, doors into units have been cut leaving gaps that can easily feed a fire as the air passes under these doors that do not meet safety standards. One resident discussed 19 code violations that were discovered when she renovated her kitchen. She conjectured there are many other apartments with these kinds of problems. Because code changes, it is not always possible to be current with every requirement. And surprisingly the Association gets conflicting information from fire officials.

Other issues that will be addressed in the amended Mendoza Report include balconies, garage, and patio repairs.

This discussion also led into a sizeable amount of time discussing hallway renovation. The Board members emphasized that structural, electric, health, and safety issues must be addressed before the Hartman Design Group would be allowed to move forward. There was also discussion about a possible new survey that needs to be done before the Hartman Group is allowed to proceed. People are still concerned that the refurbishment of the halls project needs to focus on cost and durability. One attendee pointed out that chairs in the elevator lobby are not holding up and need to be replaced.

Another topic that was brought up by an active swimmer is that tiles are falling off the walls of the pool. Also the use of the equipment in the gym is becoming more popular. There is a TV now but users need to bring headphones for effective use. Another suggestion was to install written instruction for how to operate the TV.

A suggestion from the floor recommended taking a survey to find out the expertise of residents and to get younger people involved in Association business.

Dr. Muller said he would send his notes to the absent Board Members to inform them about the discussion.

Thursday, December 1, 2011

Summary of ECA Meeting November 28, 2011


Present at the meeting: Seth Levine, Judi Barth, Ilo-Mai Harding, Alexandra Kielty Alfred Muller, David Robinson, Greg Robey, Recording Secretary.

Absent: Charles Bressler, Jim Santos

Treasurer’s Report:
According to Treasurer Muller, the ECA finances are in good shape and that the Association is able to proceed on a “pay-as-you-go” plan to address major projects like window and door replacement, corridor renovation, and elevator refurbishment.

He suggested that money be put in CDs and the BOD decided to go ahead with short-term CDs.

Capital Improvement Project: Ted Ariev (Apartment 1506) gave a report that identified some of the resources we already have (e.g. The Mendoza Ribas Report) and what consultants we need to ensure that the Elizabeth has a strategic plan for handling capital Improvements. At the top of his list of consultants is Mendoza who has to date provided us with a mechanical analysis, but who also has the expertise to assess electrical and plumbing systems. The plan is to conclude negotiations with an array of consultants in December and then retain them. Other activities that need to happen is the revision of bylaws and a financial plan to maximize monetary resources.

ECA Contractor Guidelines:  tabled.

Old Business:
Pool Management: BOD decided to give the contract to Winkler Pool Management based on a recommendation from Greg Roby.

Replacement of Damaged Screens: BOD approved such activities at the expense of the Association.

New Business
Unit Owner Request for Installation of Satellite Dish on Balcony: The owner requested permission to install the dish by drilling holes in balcony wall. BOD said the owner needs to find a non-invasive method.

Committee Reports:

Bylaw Revisions: Alexandra Kielty on behalf of the committee presented three changes to the ECA Bylaws that will advance the capital improvement project or make the Association compliant with a new law. The BOD gave her approval to move ahead and work with legal counsel to craft necessary language.

Lobby-Hallway Renovation: Discussed problem of carts hitting new wallpaper on lobby level. BOD seeking advice from Hartman Design Group.

Landscape: Replaced crab apple trees and updated front beds. Moved Japanese Maple in circle bed to a new position in that bed. New pet signs advising owners to keep their pets out of the garden beds have been installed.

Social Activities:
Dec 18: Holiday Party for residents

Comments from the Floor: Many people voiced unhappiness about moving ahead with corridor refurbishment, saying the money should not be spent at this time when there is so much else that needs to be fixed.

Invitation to Annual Box Party -- Sat Dec 3, 2-4 pm


    Annual Box Party
  
Join in wrapping and packing gift boxes for the less fortunate
 (Boxes will be donated to both So Others Might Eat* (SOME), 
and Friendship Place*,  Washington, DC)
  
Saturday, Dec. 3rd 
  2:00 – 4:00 pm

The Elizabeth West Lobby


        Welcome Contributions: 

Items for men (really needed!), women and children:
New hats, scarves, gloves (sets are extra nice) socks, 
and underwear, long johns (any size). Trial size 
toiletries: soap, shampoo, lotion, deodorant, 
razors (for men), toothbrushes, toothpaste, etc.    

        CVS, Safeway and Giant cards also make great gifts.

Can’t Come to the Party?

If you are unable to join the fun, but would like to donate 
empty shoeboxes or items for the boxes please leave items 
at front desk for Peg Downey, #615.

Cash donations will be used to purchase items for the boxes.



*SOME is a non-profit organization which seeks to help deal with poverty in Washington, D.C.   SOME  provides food, clothing, and health-care services to the poor and homeless, and job training, counseling, and low-cost housing to "break the cycle of homelessness."

*Community Council for the Homeless at Friendship Place, a non-profit organization, seeks to empower men and women experiencing homelessness to rebuild their lives with the involvement of the community.

Invitation to the Elizabeth Energy Center -- Sat Dec 3, 2-4 pm

To Promote Energy Savings in The Elizabeth


Come visit

The Elizabeth Energy Conservation Center

Saturday, December 3, 2011

2:00 to 4:00 p.m.


Reception Desk Area



GIFTS FOR ALL AGES


Jump ropes, Miniature footballs, Key chains, Magnets, Bookmarks, Post-it notes

CFL’s for Sale (great stocking stuffers)

Identify an object: What is this? = A challenge!

Brochures and more…



Cut Energy Use
Minimize Condo Fee Increases

October 2011 Minutes of ECA Board Meeting

THE ELIZABETH CONDOMINIUM ASSOCIATION
4601 North Park Avenue
Chevy Chase, MD 20815

Minutes of Board of Directors Meeting October 24, 2011

Board Present:

Seth Levine ..........................President
Charles Bressler ...................Vice President
Alfred Muller ........................Treasurer
Judith Barth .........................Director
Alexandra Kielty ...................Director

Others Present:
Gregory Roby ..............Senior Community Manager, Legum & Norman
James M. Santos .........ECA General Manager
Jana Bowcut ...............ECA Recording Secretary, On the Record

Call to Order: Mr. Levine called the meeting to order at 7:31 p.m.

Approval of Minutes:
MOTION Ms. Kielty moved, Ms. Barth seconded to approve the September 19, 2011 BOD meeting minutes. The motion passed with one abstention (5-0-1).

President’s Report: Mr. Levine welcomed new Community Manager, Greg Roby, and new Board member David Robinson. The recent reception for new residents and floor representatives was successful. The updated resident directory is available. On October 27, 2011, Hartman Design Group will present options for the hallway renovation. A Halloween party will be held on October 28 for children and grandchildren of residents.

Open Forum: No comments.

Community Management Report: The monthly report will include previous meeting minutes, an action item list for the Board, a calendar of events, and a list of service agreements. An operating statement review for September is also included, which shows a deficit of $46,422, projected against a deficit of $63,903, a favorable variance of 38%. At the end of September, there were 11 units with delinquencies in excess of $500, total $54,296, less than 1% of operations. The conversion to the C3 system is running smoothly.

General Manager’s Report: Mr. Santos reviewed the following items:
• Current work order delinquencies: Total is $860.50, which is less by $400 from last year. Of this, $273.50 is over 60 days delinquent.

• Capital Improvement Program: Ted Ariev, consultant to the Board for capital improvements, made a Power Point presentation of the basic plan, and stated that all construction and renovation projects are conducted similarly. (The presentation is available to residents in the management office.) Mr. Ariev will make a monthly progress reports to the Board.

• Trash Chutes: Trash room doors and compactors were steam cleaned at a cost of $2,190.00. Compactors require steel reinforcement to the hoppers, capital reserve expenditure.
MOTION Mr. Bressler moved, Ms. Kielty seconded to approve the proposal from Trash Masters, Inc. for $2,390.00. The motion passed unanimously.

• Emergency Generator: ECA is holding the final 10% payment of the contract with PowerServices, Inc. for the emergency generator installation.
MOTION Dr. Muller moved, Mr. Bressler seconded to approve payment of $3,419.00 to PowerServices, Inc. The motion passed unanimously.

• Snow Removal Contract: Management proposed renewing the contract with Mulheron Tree Experts for the 2011-2012 winter season. The rates are unchanged.
MOTION Dr. Muller moved, Ms. Barth seconded to approve the contract renewal with Mulheron Tree Experts. The motion passed unanimously.

• Balcony Planter Hangers:
MOTION Ms. Barth moved, Ms. Kielty seconded to purchase 50 hangers at a cost of $2,272.11 from ARC Solutions Welding. The motion passed with one abstention (5-0-1) from Mr. Robinson.

• Boiler Cleaning: Boilers are in need of cleaning and a combustion analysis test.
MOTION Mr. Bressler moved, Dr. Muller seconded to approve the proposal from Densel Company for $8,478, from operational reserves. The motion passed unanimously.

• Concrete Work: Repairs are needed to a concrete slab in the “ice melt” storage room areas above the G-1 arcade parking and one ceiling section on G-4.
MOTION Ms. Barth moved, Mr. Bressler seconded to approve the contract with HBW Group for $80,704.08 for the repairs. The motion passed unanimously.

• Elevator Work: Elevator equipment is original and fails periodically. Management recommends replacing elevator motor and upgrading doors.
MOTION Dr. Muller moved, Ms. Kielty seconded to approve the proposal from Otis Elevator for $265,411. The motion passed unanimously.

• By-Law Amendments: Management participated in a committee forum to review by-law amendment strategy. 75% approval is required to pass a by-law amendment.

• Swimming Pool Management: Management has provided five proposals to the Board. Mr. Roby recommended High Sierra or Winkler. Management will find out which company manages the Somerset pool. The discussion was tabled until next month.

• Construction Guideline Policy: Mr. Bressler and Mr. Santos met to flesh out the proposed policy. The definition of a contractor was further defined. Dr. Muller stated that the proposed policy needs to be distributed to all ECA members.

• Website: Bids from two contractors have been received; not all data has been received from a third bidder. The current contract expires in 30 days.

Treasurer’s Report: Dr. Muller reported that the auditors begin work today, and distributed a proposed Five-Year Capital Improvements Plan. He added that this is only a general guide, and that copies are available to residents in the management office.
MOTION Dr. Muller moved, Ms. Barth seconded to approve the proposed Five-Year Capital Improvement Plan to submit to the auditor. The motion passed unanimously.

New Business:
Exercise Room: Mr. Santos stated that the new equipment has been installed and asked residents to report any issues with the equipment.

Holiday Decorating: Mr. Santos asked the Board to being thinking about holiday decorating plans. Ms. Barth volunteered to assist.

Committee Reports:
Landscape: The landscaping at the circle has been updated. There have been concerns with the landscaping company. The committee welcomes resident feedback. The second phase is updating the planters on the east and west sides of the building, at a cost of $12,430. The current landscaping is young and should not be compared to more mature landscaping at other buildings.
MOTION Ms. Kielty moved, Ms. Barth seconded to approve the second phase of landscaping with Rupert Landscaping for $12,430. The motion passed unanimously.

Making a Difference (MAD): The committee will distribute a summary about the recycling programs with NAMI and A Wider Circle. A Box Party will be held on December 3, 2011 in the West lobby. On November 18, 2011 there will be a party in the lobby for Elizabeth children to make gifts to put into boxes for the homeless.

Energy Committee: The committee met recently to formulate the program for the coming year. Elevator fliers will continue. Staff will check the accuracy of thermostats in apartments.

Floor Representatives: A successful party was held to welcome new residents and to honor floor representatives.

Resident Comments:
A resident expressed concern about placement of some of the exercise equipment. Mr. Santos stated that he would look into it.

Adjournment:
The President adjourned the meeting at 9:46 p.m.
The initial draft of the minutes was prepared by Jana Bowcut of On the Record.

Respectfully submitted,
Ilo-Mai Harding
Board Secretary

Tuesday, October 25, 2011

Summary of ECA Meeting October 24, 2011

In attendance: All board members except Ilo-Mai Harding were present. Mr. David Robinson, newly appointed to fill the vacancy after Molly Frantz resigned, was welcomed . Mr. Greg Roby, the new Legum and Norman senior community manager, was introduced and briefly detailed his 13 years of experience in management of high rise condos. He is presently on the BOD of the condo building in which he resides in Virginia. His report: the financial statement end of September $46,422 which is a deficit of $17,481 rather than the projected figure of $70,00.

President’s comments: Recent reception for floor reps and new residents well done, with over 125 residents attending. The new directories are available at the front desk; thanks to Wanda Powell for organizing the reception and Halloween party; a meeting this Thursday October 27 will present the Hartman group recommendations for refurbishment of hallways.

Five-Year Plan Discussion:
Because the independent auditors are beginning their field work this week, and therefore a capital improvement plan covering the next 5 years must be presented to them for review and inclusion in their report, the Treasurer recommended a 5-year plan which would:

1. Keep all previously planned capital improvements in place (landscaping, window repairs, concrete repairs, pump replacements, etc.), but move the “large” projects (excess of $1 million dollars) to future years. This plan was to reflect the impact of all capital expenses, large or small, on the reserve balance.

2. Move back the start date of any of the “large” capital improvement projects (hallway renovation, HVAC upgrades or window and door replacement) the reserve fund will have time to build a surplus when one of the “large” projects begin in 2012-2013.

3. Consider the recommended 5-year capital improvement plan as serving as a kind of strategy "guide" for the board and management (with some preventative measures in mind) until the next system failure or we are made aware of an issue not previously known (such as the WSSC sub-metering issue relating to commercial/residential customers, for which we expect to be granted a waiver.)

4. Speculate about "general assessment" increases (or lack thereof) for future years based on anticipated impact(s) on the reserve balance.  This means considering no increase in annual fees, or fee increases of 1%, 3%, or 5% in years 2, 3, 4 & 5.  (NOTE:  ECA by-laws - like those of many if not most Maryland condominiums - prohibit the current board of directors from determining individual assessment amounts beyond the ECA's current fiscal year period:  July 1 to June 30.)

Capital Improvement Project Review: Mr. Ted Ariev, a resident with architectural expertise, gave a Power Point presentation on capital improvements. Copies of his presentation are available, upon request, from the Management Office.

In brief, Mr. Ariev laid out the process/approach that should be followed on behalf of any project:

1. Define needs (hire consultants)
2. Blueprints (develop bid documents)
3. Work Implementation Plan (identify all costs, time, what to do)
4. Identify priorities and implement ( life, safety over all else), implement
5. Amend bylaws as needed, get money
6. Do all at once; funding to begin right away

General Manager’s Report: Most of the items listed in the General Manager’s Report were discussed and approved, including install steel reinforcement to trash compactors hoppers, payment of final invoice for emergency generators, re-new snow removal contract, buy balcony planter hangers (resident/owner expense), perform annual boiler cleaning and combustion analysis tests for both boilers, proceed with repairs to concrete slab in various garage areas. Of this list, repairs in the garage are the most costly item and is estimated at $80,704.

The board engaged in an extensive discussion concerning elevator repairs, ending in approval of the General Manager's plan to do them all at once, for a total cost of $265,411.  Doing all at one time results in significant savings; there will be no cost for repairs for one year.

No decision was made on owner/contractor guidelines policy.  The definition of who is a contractor was again discussed, along with questions about hours of work; but without resolution.

The General Manager participated in a committee forum to review bylaws. Director Kielty, who heads the Bylaws Review Committee, stated that during the committee's study of current bylaws, it was discovered that a bylaw amendment requires 75% approval (i.e., an affirmative vote of owners representing 75% of the total value of the condominium,)  rather than the 65% approval previously thought.

Building Operations:
Considerable discussion on pool management, and whether the present pool management with a monthly contract was acceptable. Residents had both complaints (poor lifeguard performance, dirty,) and praise for aerobic instructor and early morning guard. The board decided to do further research and also explore other companies - particularly High Sierra and Winkler - rather than vote now.

Web site work is being evaluated (present contractor not acceptable).

Work on renewing FHA Certification is “creeping along”.

Committee Reports:

The Landscape Committee reported that it was continuing to work closely with Ruppert Landscape in order to "keep all feet to the fire" in terms of correcting and improving the planting in the front area.  Ruppert replaced the Sedum this week, reconfigured the design in the circle, installed a fall rotation of Pansies, reattached the Pyracantha on the wall west of the residents' garage entrance, replaced the failing Armeria under the Arcade signboard with Liriope, removed the Barberry, removed the annual pink Begonias, and will be planting Daffodil and Tulip bulbs in the next several days.

Jim Rich explained that the committee, along with landscape designer, Bill Angelis, completed its deliberations for the Master Plan relating to the next two garden areas:  the West Terrace and the East Terrace.   A simple "woodlands" garden is planned for the mostly shady East Terrace, and the West Terrace will see the replacement of its "outgrown" crab apple trees with three Japanese dogwood trees.  The intent is to make the West Terrace a nice extension of the West Lobby area in the warm seasons.

The board raised some concerns and questions about proceeding immediately with these next two areas.  However, once everyone was clear that the costs were within the existing landscape budget, and that waiting two years or more was not desirable (to be sure that Ruppert's work in the front garden did in fact "mature" into something better than could be expected this first summer), the board voted to continue with the next two stages of the Master Plan, based on the financial plan as originally decided upon.

Plant material will be ordered by October 28, and will be planted by November 15.

The Energy Committee reported (Mary McGuire), and encouraged residents to join the committee to help advance efforts to save energy. She mentioned that when filters are replaced this fall, the engineers will also check the thermostats.

There are excellent environmental/energy seminars in Bethesda (Saturdays) and people are welcome to attend.

Helen Secrest gave a short summary of Floor Rep Committee; several floors need replacements, with one moving soon. The committee commends Wanda Powell, management and board for excellent job with the recent reception.

Notes included input from Helen Secrest and Mary McGuire

September 2011 Minutes of ECA Board Meeting

THE ELIZABETH CONDOMINIUM ASSOCIATION
4601 North Park Avenue
Chevy Chase, MD 20815

Minutes of Board of Directors Meeting September 19, 2011

Board Present:

Seth Levine ..........................President
Charles Bressler ...................Vice President
Alfred Muller ........................Treasurer
Ilo-Mai Harding ...................Secretary
Judith Barth .........................Director
Alexandra Kielty ...................Director

Others Present:
Lisa Kelly ...................Legum & Norman
James M. Santos .........ECA General Manager
Jana Bowcut ...............ECA Recording Secretary, On the Record

Call to Order: Mr. Levine called the meeting to order at 7:31 p.m.

Approval of Minutes:
MOTION Dr. Muller moved, Ms. Harding seconded to approve the August 15, 2011 regular meeting minutes. The motion passed with two abstentions, by Mr. Levine and Ms. Kielty (3-0-2).

President’s Report: Mr. Levine welcomed Ms. Kielty back to the Board. He added that the Board will meet in executive session to fill the remaining vacant seat.

Mr. Levine stated that the new exercise equipment has arrived. An engineering/architecture study has been commissioned, spearheaded by Ted Ariev. A reception is planned to thank all the floor representatives for their contributions. A quarterly newsletter will be published soon.

Treasurer’s Report: Dr. Muller stated that ECA funds are kept with Morgan Stanley. Each account has funds in CDs and money market accounts. The CDs are insured up to $250,000 by the FDIC. The money market funds are insured for $500,000. The combination of the operating account and the reserve fund is currently more than $400,000, which means funds will need to be transferred to a CD.

Management Report: Mr. Santos provided the following updates:

Legum and Norman is converting to a new accounting program, called C3. It will allow homeowners to view their accounts online and will be user-friendly for staff.

Mr. Santos noted two changes to the 2012-Attachment “A” in the management report: there will be a charge of $.75 for color copies, and a charge of $5.00 per unit per year for homeowners using Direct Debit services.

New: a listing to the BOD of all action items to be addressed at BOD meetings.

Some condos have a problem with water coming through the balcony doors, due to the negative grade of balconies. New glass doors with a higher threshold are ultimately needed, but the concrete on some balconies may need to be ground down. Caulk joints will also be checked and management may purchase sand bags to block water.

Work order delinquencies total $1435, with $344.50 being 60 days overdue.

A trainer, Ms. Duda, will be on-site on Saturday to train residents on the new exercise equipment. Her visit is complementary, but the ECA may want to hire her again for those who cannot attend. She is available for personal training as well.

The annual fire alarm test was performed in August and all devices passed. The annunciator control panel at the front desk may need replacing.

Management wishes to purchase a screen inventory of ten screens for all size windows and balcony doors.

MOTION Dr. Muller moved, Ms. Harding seconded, to purchase the screen inventory from Blaine Window for $3,884.16, dependent on legal counsel’s approval. The motion passed (5-1-0).

Management has requested a 3-month extension to the subscription with AtHomeNet, Inc. for web site hosting services. Another provider, Association Voice, is being considered. Mr. Santos will obtain pricing and information about other options by the next BOD meeting.

Mr. Santos asked for feedback from the Board regarding a pool management contract. The current contractor was the best price and is familiar with the pool. The BOD requested researching other options.

A test will be performed by HBW Group on Wednesday, September 21, to test the integrity of the concrete slab above the G-1 Arcade Parking. Approved cost: $1,633.00.

Mr. Santos stated that elevator car #5 on the East side was shut down for three weeks for repair. He recommended significant upgrades to all elevators totaling $268,000. Mr. Levine requested a detailed proposal.

Mr. Santos stated that the FHA certification expired on July 31, 2011, which was recently brought to his attention. Legal counsel recommended hiring FHA Pros to handle submitting the application with documents. Management approved the expense of $1,500, and this will be completed within 30 days.

New Business:
Ms. Kielty raised the issue of revising the by-laws with regard to McQuay unit replacement and offered to take the lead on amending the by-laws in coordination with Jim Santos and legal counsel.

Dr. Muller asked when Hartman Design Group will present their design for the hallway renovations. Ms. Barth will talk to the designers and get a couple of dates.

Committee Reports:
Landscape: The committee has met with the landscaping company (Ruppert) and discussed finishing the master plan. There will changes and improvements, such as moving plants. There is $10,000 budgeted for landscaping. The Japanese maple tree in the front circle will be moved to create room for plants in front of it.

Energy Committee: The committee has not met recently, but is waiting for directions from management. A new interim chair has been appointed.

Social Committee: There will be a Hallowe’en party on October 28, 2011 from 3:30 to 5:30 pm. All children in the building and residents’ grandchildren are invited.

Making a Difference (MAD): Another storage room has been cleaned out to hold furniture. A pick up is scheduled with A Wider Circle in a week. Donations to NAMI are going smoothly.

Exercise Committee: The new equipment has been installed. The trainer will be on-site on Saturday from 11:00 to 12:00 p.m.

Open Forum:
A resident asked if there have been any recent changes to the by-laws. Ms. Kielty clarified that the Board is just beginning to look into amendments to the by-laws.

A resident spoke in support of the elevator work, stating that broken elevators impose difficulty to the residents. The resident also stated that she needed clarification as to who is responsible for cleaning/replacing screens.

A resident expressed concern that residents do not know who the applicants are for BOD vacancies. The same resident added that one issue to be considered in changing the
by-laws is disallowing non-owners to serve on the Board. The resident also expressed concern about hallway renovation plans, an important budget issue.

A resident expressed frustration with the overall sound system at BOD meetings. The same resident also supported elevator refurbishment.

Ted Ariev, who has been tasked by the Board to identify and roadmap refurbishment projects, stressed that life, health and safety issues take precedence over everything else when considering ECA improvements.

Adjournment:
The President adjourned the meeting at 9:31 p.m.

Secretary, The Elizabeth Condominium Association, Inc.