James M. Santos .........ECA General Manager, Legum & Norman
Approval of Minutes:
MOTION Dr. Muller moved, Mr. Robinson seconded to approve the November 28, 2011 regular meeting minutes as amended. The motion passed with one abstention by Mr. Bressler (5-0-1).
Treasurer’s Report: Dr. Muller presented the following report:
The first draft of the Auditor’s Report has been received and is being reviewed. A final draft will be received within the month.
Legum and Norman’s new financial accounting hardware has delayed financial statements. Hopefully November and December statements will arrive shortly.
Obligations for January exceeded funds in the Operating Account, mainly due to an unexplained increase in utility bills, as well as health insurance payments. Management advised a transfer of $200,000 from the Operating Reserve to the Operating Account. Management and Treasurer will continue to monitor the Operating Account, and seek to replenish the Reserve.
ECA account Operating Reserve balances with Morgan Stanley is as follows:
Acct #642101663 total= $1,366,114.93
Acct #642101806 total= $ 494,835.46
Old Business:
Ted Ariev updated the Board regarding refurbishment plan in the building. He recommended that the plan name be changed to “Maintenance, Repair and Improvement Program.”
In December, the Board signed a contract with Mendoza, Ribas for $40,000 to conduct a forensic analysis and review mechanical, electrical and plumbing elements in the building. Work has begun and should be completed by mid-Spring.
Proposals have been received from three structural consulting firms: Tadjer-Cohen-Edelson Associates ($38,500), Structura ($29,900), and Wiss, Janney, Elstner Associates ($32,000).
Mr. Ariev expressed a preference for Wiss, Janney, Elstner Associates.
An architect has been selected and when services are needed, the Board will be presented with a proposal. An environmental consultant will be identified to use on an on-call basis.
MOTION Dr. Muller moved, Mr. Bressler seconded to award the contract to Wiss, Janney, Elstner Associates for $32,000, plus the estimated $11,000 for a third party contractor. This would be paid for out of the account for building façade repairs. The motion passed unanimously (6-0-0).
Contractor Guidelines: The current version, 4.0, has been reviewed by counsel and sent to owners for comment.
MOTION Ms. Barth moved, Ms. Harding seconded to approve the current version of the guidelines, with no modifications. The motion passed unanimously (6-0-0).
Management Report: Mr. Santos and Mr.Roby reported on the following items:
· The delinquency for work orders is $758. Of that, $529 is over 60 days delinquent and those residents have had their in-unit maintenance privileges suspended.
· The Association received a waiver approval from WSSC, meaning that a sub meter, a large expense, was not required for commercial condominiums.
· Management proposes increasing the rent of the Association-owned apartment by 3.32% on March 1, 2012. The apartment will still be below market rate..
MOTION Mr. Robinson moved, Dr. Muller seconded to approve a 3.32% increase in rent as of March 1, 2012. The motion passed unanimously (6-0-0).
· Winker Pool Management services will begin on February 1. The prior company, Aqua Fit, conducts water aerobics classes. Mr. Santos approached Aqua Fit to continue the class and provided them with a memorandum of understanding, allowing a contractor to use the facility. A water fitness company recommended by Winkler could also be utilized.
· The annual maintenance contract with Densel Co. HVAC mechanical contractor is up for renewal, with a 2.5% increase in price. The engineering staff and Mr. Santos are satisfied with their work and their prices are competitive.
MOTION Dr. Muller moved, Mr. Robinson seconded to renew the contract with Densel Company for $16,570 annually. The motion passed unanimously (6-0-0).
· The East elevator #5 door renovation work should be completed by January 27. The East elevator #6 door will then be renovated before work moves to the West tower.
· Replacement of supply valves in heat and A/C units is ongoing. So far, 10 tiers have been completed (less than 50 percent of the building).
· Some balcony doors are not functioning, are beyond long-term repair, and water is entering units. Temporary repairs are being made and owners are being compensated. The Board recommended selecting a brand name and style and replacing these doors as needed. Mr. Santos stated they would not need to be replaced again since outside appearances are similar. Ms. Kielty suggested seeking a proposal and cost estimate.
· Management met with Hartman Design Group and the general contractor to further refine the scope of work in the hallways, such as upgrades to life safety systems and surveillance cameras. The water pipes on the 1st, 8th, and 10th floors are all included in the mechanical scope of work. Wallpaper repairs have been made in the hallway and business center.
· Home Paramount is not providing adequate pest control service, and Management recommended selecting Ehrlich pest control.
MOTION Dr. Muller moved, Ms. Harding seconded to accept the proposal from Ehrlich pest control for $240/month. The motion passed unanimously (6-0-0).
· As of October 31, 2011, there was a surplus of $54,047 in operating expenses, and a year-to-date surplus of $7,625. As of November, there was a surplus of $149,745 in operating expenses. There was a year-to-date surplus of $157,369, against a projected budget deficit of $31,233, resulting in a favorable variance in budget projections of $188,602.
· Management spoke to legal counsel about a by-law amendment to transfer ownership of the fan coil units to the Association. Counsel stated that the Association has the right to enter a unit and make repairs on a unit that is in disrepair. Replacement could be the ultimate act of repair and maintenance. Counsel is considering this and will write an opinion to the Board.
Committee Reports:
-Refurbishment Committee: The Board met on December 19, 2011, with Ted Ariev and Hartman Design Group to discuss corridor renovation. Items discussed were features such as life safety devices, and having renderings done of both types of carpets together with furniture options. Hartman stated that carpets must be industrial quality and able to withstand high traffic.
Comments from the Floor:
-A resident inquired where the furnishings for the hallways would be purchased. He stated that an effort should be made to purchase items in the United States.
-A resident expressed concern about hallway renovation implemented first when there are many other vital projects to consider. The resident was informed that Mr. Ariev’s group is compiling information in order to decide sequencing of projects. The resident added that the Association should first do the projects that concern safety and health.
-A resident recommended that a lawyer be present at Board meetings, given the issues and fiduciary choices. Mr. Bressler stated that attorneys are frequently consulted in all legal issues.
-A resident asked if a poorly working treadmill in the exercise room had been fixed. Mr. Santos stated that Heartline Fitness came and tested the equipment, and could not find anything wrong.
-A resident stated that the window and door replacement should be the first priority, as it will result in energy savings.
-A resident expressed concern regarding confronting hired contractors when they want a good job done. Also, some owners are giving their key fobs to contractors, which is a security concern.
-A resident reported that often the front desk is not manned, and that the package reporting system needs improvement. Also, some residents are bringing their bicycles through the lobby. Mr. Santos requested that all residents report house rule violations to him or Wanda Powell.
-A new owner asked for clarification as to whose responsibility it is to service fan coil units. Mr. Santos stated that the governing documents state that the fan coil units are the property and the responsibility of the owner. However, the Association has a contract to service the units, which has blurred the lines of responsibility. The Board is clarifying the matter.
Adjournment:
The Vice President adjourned the meeting at 10:05 p.m., with the Board to meet immediately in executive session, in concordance with section 11.109.1 of the Maryland Condominium Act.
The initial draft of the minutes, upon which these minutes are based, was prepared by Jana Bowcut of On the Record.
Respectfully submitted,
Ilo-Mai Harding, Board Secretary