Board Present: Zlatan Beca, Makarand
(Mak) Dehejia, Monique Fridell, Al Muller, Lyle Schwartz, Christopher Wemple
Absent: Rhonda Taller
Others Present: ECA General Manager
MaryAnn Hall, Assistant Manager Romaine Cureton, and Jeremy Tucker (ECA Legal
Counsel, Lerch Early & Brewer
Highlights of the meeting:
Management Report
· Garage
Project
o
The budget for this project has been
exceeded by 20% with no cap yet declared. The work on G-1 is taking less time
(so less expensive), but the work on G-4 is taking more time (more expensive).
o
In November, the estimated completion
date was the end of August but now the contractor is not giving us a projection
of cost or completion.
See Comment below from Lyle Schwartz. The info above on the garage project was taking from the management report.
See Comment below from Lyle Schwartz. The info above on the garage project was taking from the management report.
· Plumbing
o
In mid-January, a major backup problem occurred
in the 14th and 15th tiers due blockage in the pipes from
broken snakes (a.k.a. auger, implement
used to clear blockages) and other debris.
o
Also in January, O’Connor Plumbing cut
into a hot-water pipe and caused flooding on the 9th and 10th
floors as well as shorting out the fire alarm which blasted for 90 minutes.
o
In early February, a makeshift conduit
for hot water which was an attempt by a past building engineer to bring more
heat to the concierge desk burst shorting out the fire alarm again and dumping a
considerable amount of hot water in parts of the west lobby and the west elevator
lobby.
· Noise
Noise that had been occurring for
years with intermittent loudness in tiers 10 and 01 has been resolved in a
common sense solution as advised by an expert from Thomas Downey Limited.
· New Concierge
Service
The Jeffrey Scott Concierge
service began working in the Elizabeth on January 1, 2019.
· Fire
Evacuation Maps
The new fire evacuation maps
need to be redone because they do not accurately identify the building layout.
One resident suggested the Board and Fire Committee look at the easy-to-read
fire evacuation maps in the nearby Marriott Courtyard which are much smaller and
produced on aesthetically pleasing and durable brushed stainless steel.
Loan
Motion to approve an additional payment of $75,000 for pay
down of the loan was withdrawn. At this time, we will continue the payments as
scheduled.
Employee Handbook
The motion to
approve the employee handbook was tabled pending further consideration.
Rental Unit
2-13-19 Comment on the garage project from Lyle Schwartz:
The current actual expenditures are at ~50% of budgeted (with contingency), but projections do suggest that the final total will significantly exceed that amount.
It was the already finished work on G1 that appears to have been the most expensive per sq. ft., due to spallation on the ceiling below. Current, very limited work on lower floors seems to result in much less spallation and so less cost and more rapid completion. G4 will have no such issues since it is “slab-on-grade” with no ceiling below it and may actually end up costing a bit less than originally estimated..
CPR has certainly continued to give us estimates of both cost and completion dates, but they and we recognize the uncertainty of such estimates as the work load on the G2 and G3 levels can only be estimated based on previous experience. Current estimates seem to be on the high side as we find less work required on the lower levels, and will likely be adjusted as they get more experience on other parts of G2 and G3.