Saturday, April 13, 2019

ECA Budget Town Hall—April 10, 2019


While I am going to provide some highlights of the Elizabeth Condominium Association Town Hall meeting held April 10, 2019, I am not going to reference specific numbers discussed. You as an Elizabeth owner and an ECA Association member can obtain the documentation from the Management Office.

ECA Treasurer Lyle Schwartz conducted the Town Hall and said our financial picture is trending upward—we are aggressively paying down the loan we procured to pay for our window and balcony door replacement as well as our façade restoration. We have enough money to choose our next major project. While this year, the recommendation is for a 2% increase in condo fee, he looks to the future when he thinks it will be possible to reduce our condo fees.

Board Member Mak Dehejia addressed condo fees and our decreasing property values.  He said the problems as he sees them fall into two categories: soft problems and hard problems. In the soft problem category, he spoke of the spirit and atmosphere in the building which is toxic and the fact that we have a bad reputation. He called for an improvement in communications and other efforts to improve our reputation. He added that at one time we were a luxury building, but now unfortunately we are no longer.

Then Mak spoke about how we are always fighting fires (meaning we address problems late instead of pro-actively doing needed maintenance).  He said there should be enough money in the budget for infrastructure and maintenance issues as they arise in order to avoid firefighting.

Finally, he said that the renovation of the hallways MUST be accelerated.  He said it is no longer acceptable for our General Manager to say that the hallways will have to wait for the completion of the garage project.

Board Member Al Muller said he recommends a 1% increase in condo fees. Chris Wemple and Mak Dehejia both pointed out that since we cannot have a special assessment, we are left with only two other ways to raise money for our needs: condo fees and loans. Since we already have a loan, we need increases in condo fees to prepare for our future needs/emergencies which almost certainly will arise because the Elizabeth is an old building. Chris’ and Mak’s argument did not persuade Al who continued to say he wanted a 1% increase.

Despite Director Mak Dehejia’s statement that it is no longer acceptable to say that the hallway renovation will have to wait for completion of the garage project, General Manager MaryAnn Hall recommended that we put off the hallway renovation until the garage project is finished, but tackle instead renovation of the pool area and the fitness center. These efforts would entail closing the pool for two weeks to give it a face lift (including the replacement of the ceiling tiles) and closing the fitness center for two weeks to do the same there (i.e., update equipment, paint, and repair the men’s sauna). MaryAnn said she had put aside a significant amount of money in this year’s budget to buy new pool and outdoor furniture. Her explanation  was that it was too much disruption for residents to have two major projects going on at the same time.

Additionally, our GM recommended that we have a committee for the corridors. She said she had budgeted a small portion ($500,000) for hall renovation this year (FY 2020),  and the same amount in the following two fiscal years ($500,000 each of those years) for a total of $1.5M. Lyle Schwartz said we could allocate the amount currently set aside this year (FY 2020), but,  and instead of spreading the renovation over two more fiscal years, simply allocate $1M in FY 2021. 

NOTE: My understanding is that the estimate from Hartman Design in 2016 was $2.8 million and that the amount could be paid over a period of three years, phasing in the renovation over the same three-year period.  Of course it is hard to say what the cost will be three years later in 2019. What we don’t want is a sloppy job and poor-quality materials which will cause an immediate do-over like we experienced with the renovation that preceded our current lobby done by the Hartman Group. That do-over predated Legum & Norman cost us a lot of unnecessary dollars and ill will.

Also it should be noted that since 2012, we have had two committees work hard on a new hallway design, resulting in three (3) proposals for the hallways, with the final proposal successfully presented at a March 2016 Town Hall Meeting. In addition, we  have an important resource person living in the building—someone who is an architect and designer with Marriott.  He participated on both the Design Committees that ultimately successfully presented a design to the community in 2016, a design that was well-received by all in attendance, no small feat in a building as diverse as ours.

Monique Fridell talked about the need to improve our curb, speaking specifically about the landscaping and suggesting we look into a new updated canopy.

Other topics that came up included:

—the need for hallway renovation was overwhelmingly on the minds of many people attending the meeting.

—the unbudgeted large expense of painting the entire garage. At this time only the patches worked on will be painted.

—the need for  a marketing campaign to correct the poor reputation of the Elizabeth and is also tied in the communications/toxic environment problems we have in the Elizabeth.

---One person commented that we live in an ordinary building, not a luxury high rise. This fact was disputed by several in attendance, one original owner, and others who moved in later.  It was pointed out that the Elizbeth was originally sold as a luxury building and enjoyed that status until recently, and throughout its life has been marketed as a luxury building and is so marketed today.  Even new owners attested to that fact. It was also pointed out that that our neighboring condos also market themselves as luxury buildings, and they are our competition for buyers and renters.

Additionally, it was pointed out that what makes The Elizabeth a luxury building (despite decline of some of these items) is its services: 24-hour concierge, indoor year-round swimming pool, fitness center, large number of guest parking spaces and sufficient parking for all residents, party room, year-round A/C, live-in engineers on 24-hour call, in-unit washer-dryers, and high-end lobby with community spaces like library, piano, large-screen TVs.

Overall, I would say this was a well-run Town Hall meeting where important points were made. What the meeting suggests is that as long as we elect good leadership to the Board who understand the importance of maintaining the building in all aspects—financial, technical, operational, and protecting our property values, —we who live here will have the quality of life expected for this neighborhood of Friendship Heights.



Monday, April 8, 2019

Current Bylaw Amendment & its explanation


I would like to set the record straight about the proposed bylaw amendment regarding qualifications to serve on The Elizabeth Condominium Association Board of Directors and which was submitted to the Board as a petition on March 26, 2019 by Molly Frantz.



Here is the amended bylaw as set forth in Ms. Frantz’s petition:





 
While it is true that this change is essentially similar to the bylaw change prepared for the May 2017 annual meeting, the reason Ms. Frantz circulated the March 26, 2019 petition for this change was specifically to target a sitting member of our current Board and therefore was politically motivated. The hope of Ms. Frantz was to remove the sitting Board member and replace that Director before or at the May 1, 2019 annual meeting to give Ms. Frantz a greater opportunity to win election to the Board.



I would also like to point out that Ms. Frantz resigned from the Board in 2011 saying in her letter to the Board  that she couldn’t tolerate the “personal ill-will, petulance [sic] behavior, hidden agendas” and yet her petition demonstrates the same kind of personal ill will.



You may want to review my blogpost dated April 23, 2017, which reported on the 2017 Meet the Candidates for the Elizabeth Board.






Molly Frantz, Alfred Muller, and Zlatan Beca were all running for the Board that year. At the conclusion of that blogpost, I posed a number of questions and thoughts which may be again helpful in thinking through the candidates currently running for the Board. These include asking:



Do you want a Board member:

— whose policy has been frequently presented as a “run to failure”—wait to repair building infrastructure only when it fails?

—who has a history of attacking a sitting Board?

—who lacks a realistic understanding of business and/or accounting practices?



Finally, do you want a board that will work together on behalf of everyone in the Association? That only leaves the question about what we can do as a group to encourage polite and civil behavior among attending Association members who seem to forget that serving on The Elizabeth Condominium Board is a voluntary position.





As you can see such questions are relevant to the 2019 election and certainly the issue of civility looms large. Please take the opportunity to read the bios of the current Board candidates and attend the Meet the Candidates night.  In addition, you are encouraged to Google them for more information. As I have done in the past, I will report what is said after the Candidates speak.
-->

Tuesday, March 26, 2019

Summary of ECA Board Meeting March 26, 2019

Board Present: Zlatan Beca, Makarand (Mak) Dehejia, Monique Fridell, Al Muller, Lyle Schwartz, Rhonda Taller (on conference call), Christopher Wemple

Others Present: ECA General Manager MaryAnn Hall, Assistant Manager Romaine Cureton, Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer), and Dan Watkins, FEA (Consulting engineering firm on garage project).  

Highlights of the meeting:

Garage Project
The repair quantities (square footage including the depth) increased. Contributing factors –under-slab patches are coming loose. The work done in the past was not up to standards. This was an unforseen and a uniquely bad problem. They sound out (sounding is an engineering term used to test the concrete in need of repair) well but when workers dig in the patches dislodge. The depth of repair is what is causing the additional cost and time. They still have 15 to 20 phases to go through. Another problem is the time it takes to move vehicles from parking spaces. Coating has a temperature and humidity sensitivity. G1, 2, 3 will be uniformly coated but not G4. Cannot coat G4 because it is a slab on grade (on soil). Current estimate for completion is January 2020. Coating repairs required every 5 years.

President’s Report
·      If you have someone who works for you, tell the front desk when you expect them. This has to do with parking issues related to the garage repair.
·      Amazon workers coming to DC and Friendship Heights is very desirable. Election coming up. We need to continue upgrading our building and that depends on having the talents necessary to do this important work by the board members.

Management Report
·      West Lobby
Working on getting a color match from decorator for painting the molding.
·      Cooling Tower
Cleaning has been done and the a/c has been restored.
·      Important Dates
April 1            BOD nominations due in management office by 6 pm
April 5            Candidates display board goes up in the lobby
April 7            Meet & Greet for new residents in West Lobby
April 10          Town Hall meeting on 2019-20 budget
April 15          “Meet the Candidates” night
April 22          Budget & Finance meeting
April 23          Regular Monthly Board meeting
May 1             2019 Annual Meeting

Merv Filters
Discussion concerned whether to give unit owner a choice between Merv 4 and Merv 8 filters. Do we need for owners to sign a disclaimer if Merv 8 filters are installed, particularly in old HVACs.

Motions
·      Loan—motion to approve the third payment of $75,000 for pay down of the loan was approved unanimously. Additional motions approved to pay down a grand total of $707,308 (includes the third payment). As of June 30, 2019, the outstanding principal on the loan is just over $3 million.

·      Merv Filters—make the standard pleated Merv 5 filters, changed 3 times a year, and give the option for Merv 8 but a release of liability must be signed. Check the condensate lines. Approved unanimously.

Comments from the Floor

Bylaw Amendment
Petition was handed in today to amend bylaws that the composition of the Board be all unit owners or the spouse of a unit owner. 

Party Room is restricted for security reasons. Furniture and other items have been broken or stolen. Resident objects to limited access.

Fire Signs are inaccurate and the stairways are inconsistently marked. If you got trapped in the stairs it would be impossible to pinpoint where you are to the rescue workers.

Thursday, February 28, 2019

Summary of ECA Board Meeting February 26, 2019


Board Present: Zlatan Beca, Makarand (Mak) Dehejia, Monique Fridell, Al Muller, Lyle Schwartz, Rhonda Taller, Christopher Wemple
Others Present: ECA General Manager MaryAnn Hall, Assistant Manager Romaine Cureton, Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer), and Jeremy Powell, CPA, Goldklang Group
Highlights of the meeting:
Yearly Audit Report
Jeremy Powell of the Goldklang Group presented the completed report saying that despite our loan debt, the Elizabeth is remarkably in good financial shape given our dire situation two years ago. We have adequate financial cushion in our operating funds.

President’s Report
·      He noted the passing of two Elizabeth neighbors: Helen Huntley and Arnold Kutzmak.
·      He urged Association members to keep in mind that the annual election will take place in May and that we should participate in that election at minimum by attending the meeting or voting a proxy.

Management Report
·      Garage Project
o   The last two phases of the project have required fewer repairs, which is good news.
o   The General Manager will try to arrange for an in-person report on the status of the project from one of contractors for next the Board meeting.
·      West Lobby
o   ServPro has completed its work and there is no mold.
o   Work to restore the lobby and the moldings is ongoing and should be completed by February 28, 2019.
·      Noise
As stated in the last meeting summary, noise that had been occurring for years with intermittent loudness in tiers 10 and 01 has been resolved by an expert from Thomas Downey Limited. What had not been stated is that minor plumbing issues in an apartment on the East Side were fixed and that was what allowed the noise problems to be resolved on the West Side.

Motions
·      Loan—motion to approve an additional payment of $75,000 for pay down of the loan was approved unanimously.
·      New Version of Employee Handbook—except for one modification, the new version of the employee handbook that was done by Rhonda Taller was approved unanimously.
·      No Smoking Amendment—Board voted to send it to the Association members after our legal counsel puts the package together. Vote of the Association will be accepted in the management office and at the annual meeting.
·      Merv Filters—additional information required the motion to be delayed until the March meeting.

Monday, February 11, 2019

Summary of ECA Board Meeting February 7, 2019

Board Present: Zlatan Beca, Makarand (Mak) Dehejia, Monique Fridell, Al Muller, Lyle Schwartz, Christopher Wemple
Absent: Rhonda Taller

Others Present: ECA General Manager MaryAnn Hall, Assistant Manager Romaine Cureton, and Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer

Highlights of the meeting:

Management Report
·      Garage Project
o   The budget for this project has been exceeded by 20% with no cap yet declared. The work on G-1 is taking less time (so less expensive), but the work on G-4 is taking more time (more expensive).
o   In November, the estimated completion date was the end of August but now the contractor is not giving us a projection of cost or completion. 
See Comment below from Lyle Schwartz.  The info above on the garage project was taking from the management report.




·      Plumbing
o   In mid-January, a major backup problem occurred in the 14th and 15th tiers due blockage in the pipes from broken snakes (a.k.a. auger,  implement used to clear blockages) and other debris.
o   Also in January, O’Connor Plumbing cut into a hot-water pipe and caused flooding on the 9th and 10th floors as well as shorting out the fire alarm which blasted for 90 minutes.
o   In early February, a makeshift conduit for hot water which was an attempt by a past building engineer to bring more heat to the concierge desk burst shorting out the fire alarm again and dumping a considerable amount of hot water in parts of the west lobby and the west elevator lobby.
·      Noise
Noise that had been occurring for years with intermittent loudness in tiers 10 and 01 has been resolved in a common sense solution as advised by an expert from Thomas Downey Limited.
·      New Concierge Service
The Jeffrey Scott Concierge service began working in the Elizabeth on January 1, 2019.
·      Fire Evacuation Maps
The new fire evacuation maps need to be redone because they do not accurately identify the building layout. One resident suggested the Board and Fire Committee look at the easy-to-read fire evacuation maps in the nearby Marriott Courtyard which are much smaller and produced on aesthetically pleasing and durable brushed stainless steel.

Loan
Motion to approve an additional payment of $75,000 for pay down of the loan was withdrawn. At this time, we will continue the payments as scheduled.

Employee Handbook
        The motion to approve the employee handbook was tabled pending further consideration.

Rental Unit

         Approval of lease renewal on Unit 10 was tabled. Approved lease renewal with 6 votes in favor.


2-13-19 Comment on the garage project from Lyle Schwartz:

The current actual expenditures are at ~50% of budgeted (with contingency), but projections do suggest that the final total will significantly exceed that amount.
 

It was the already finished work on G1 that appears to have been the most expensive per sq. ft., due to spallation on the ceiling below. Current, very limited  work on lower floors seems to result in much less spallation and so less cost and more rapid completion. G4 will have no such issues since it is “slab-on-grade” with no ceiling below it and may actually end up costing a bit less than originally estimated..
 

CPR has certainly continued to give us estimates of both cost and completion dates, but they and we recognize the uncertainty of such estimates as the work load on the G2 and G3 levels can only be estimated based on previous experience. Current estimates seem to be on the high side as we find less work required on the lower levels, and will likely be adjusted as they get more experience on other parts of G2 and G3.
 






Thursday, November 29, 2018

Summary of ECA Board Meeting November 27, 2018

Board Present: Zlatan Beca, Monique Fridell, Al Muller, Lyle Schwartz, Rhonda Taller, Christopher Wemple

Absent: Makarand (Mak) Dehejia

Others Present: ECA General Manager MaryAnn Hall, Assistant Manager Romaine Cureton, and Jeremy Tucker (ECA legal counsel, Lerch Early & Brewer

Highlights of the meeting:

President’s Report
·      Noted the unexpected deaths of long-time resident owners Alexandra Kielty and Sally Hart.
·      Described dissatisfaction with NFC, the concierge service we currently employ.
·      Mentioned Thomas Downey engineer ongoing investigation of noise issue affecting West side tiers 01 and 10 as well as common areas that include mail corridor and West side lobby areas.

Legal Report
·      Reviewed details related to the Larry Hirschman embezzlement with some new information:
o   Letter with the summary of findings helpful but not complete.
o   Accounting firm Burdette, Smith & Bish did the forensic audit. They only furnished the ECA with the portion that dealt with the Elizabeth.
o   Questions remain:
§  What analytic procedures were used by forensic accountants?
§  Was anyone else involved in the embezzlement?
§  Can we see the paper trail on the analytic work?
·      Look for a mailing on the proposed bylaw on new smoking restrictions at the Elizabeth. This is a draft for comment. There will be a town hall meeting January 16, 2019.

Financial
·      Loan payment—Motion to approve a $75,000 loan pay down per the 2018-19 budget passes with attending 6 directors unanimous.
·      The General Manager is monitoring when ECA needs to refinance the loan.
·      The ECA annual financial audit was delayed by waiting for the forensic audit results but will move forward with new information provided.

Management Report
·      Garage Project
o   Work is being completed on the incoming side of the guest parking entrance. The FOB reader will be moved back to the incoming side around Dec 3. Work will then proceed around Dec 5 on the outgoing side of guest parking.
o   Estimated total completion of the garage project is now set for August 2019.
·      Garage Door Replacement
o   On Dec 4 the resident entrance of the garage will have its door replaced due to numerous people hitting the door with their vehicles.
o   Exiting and entering the garage will be difficult on that day from 9 am to 3 pm. If it is at all possible it is advised to leave the garage before 9 am and return after 3 pm. Instructions for that day, including how to re-enter the garage have been put under resident doors.
·      Plumbing
o   Septic pits in the garage have been cleaned and pipes replaced as needed.
o   In meeting with several plumbing contractors, the ECA GM has determined that main lines should be cleaned quarterly on the lobby, first, and second levels where most of the clogs occur. Additional plans have been discussed.
o   If backups from these lines continue to occur than all drain lines will require replacement which will run into millions of dollars
·      Noise
o   Steve Johnston, Ph.D. from Thomas Downey Limited (consulting engineers) have been onsite to investigate the noise in the building as described in the ECA President’s Report above,
o   The report will be shared with the residents.
·      Landscaping—fall flowers have been installed
·      General maintenance
o   Apartment inspections are proceeding on the East Tower; West Tower is done.
o   Window Cleaning—is completed and went better than last time.
o   Metal and Stone Cleaning—was done on Nov 7, 2018.
·      Roof—Temco Roofing inspected the roof without major issues. Roof inspections are scheduled for every six months.

New Business
·      Concierge Companies were considered:
o   NFC—current, not meeting their contract specifications.
o   S.P. Jones Enterprises—used by the Carleton
o   NVT Staffing—more for temporary staffing
o   Jeffrey Scott Concierge
§  24/7 staffing without extra cost.
§  Pays employees more than minimum wage with built in bonus program.
§  Trains employees in a 40-hour program with exam, includes conflict resolution.
·      Motion to hire Jeffrey Scott Concierge as new concierge passes with attending 6 directors unanimous.

Committee Reports
·      Fire & Safety
o   The committee completed a draft evacuation plan but needs information from the Fire Department to complete the document.
o   General Manager MaryAnn Hall said she has someone working on evacuation instructions which will be posted on each floor since the Fire Department is requiring immediate compliance.
·      Merv Filter for HVACs
o   Molly Frantz brought used filters of various Merv ratings to show how much dust was collected.
o   ECA GM said she would get additional information on pricing. The Board will decide at the next board meeting in January.

·      Social Committee—there will be a holiday potluck on Saturday December 29, 2018 from 6-9 pm.