Highlights of the meeting:
—Delinquencies: are
high at around $70,000 with $31,000 for garage spaces maned by Chevy Chase Land
Company who are neither in their office or answering their phones according to
attempts by our General Manager to resolve this.
—Garage
Project: The unending work is now scheduled for completion the end of
August. This last period, CPR failed to lay down the floor coating but painted
lines. Now this work will have to be corrected.
—Management
Office: The management office is now open with General Manager and Assistant
General Manager in residence. However, the door is locked. Appointments must be
made to see them.
—Elevators:
The Montgomery County elevator inspection failed because the garage elevators
had water pooled underneath them mixed with hydraulic fluid. Our chief engineer
is working to resolve this problem.
—Annual
Meeting & New Candidate Nominations: anticipated for September. A
discussion ensued about allowing new candidates to either be nominated or
self-nominated. However, this has to happen quickly given that a company has
been hired to handle the election which will include electronic voting, mail in
ballots and ballots placed in the management suggestion box mounted on the wall
outside the management office.
—Candidates’
Public Forum: A suggestion was made to have candidates speak on issues
facing the building. Connie Rowe was appointed to run this meeting.
—Pool
Opening: July 8 (11am to 7 pm, 7 days a week—not mention made of
time for a break) is when limited use of the pool is supposed to begin but this
depends on getting the cleaning supplies necessary to keep the pool area safe.
Once it opens, make appointments with the concierge who will lend a special fob
for access. You will be required to fill out a disclaimer form attesting to
your health and that you will not hold The Elizabeth responsible if you get
Covid19. Masks must be worn to enter the pool area. Two people can use it at
one time or small family units, no guests for a 45-minute session. 15
minutes will be allotted for cleaning. Glass doors to the outside will be open
to keep the air circulating.
—Fitness
Center: Because air circulation in the Fitness Center is poor,
there will be no access to this facility at this time. Coronavirus makes this
facility too risky.
— Contractors working inside
individual units:
According to Elizabeth
house rules, individual unit owners are supposed to notify the management
office and let them know that contractors are in the building and to schedule
an elevator if needed. This has not been enforced for a long time and presents
risks during this pandemic period. Our General Manager and AGM said this has
been an ongoing problem. The owners give key fobs to their contractors and they
park usually on G-1 in spaces assigned to residents. Board discussed criteria
that any outside contractor had to wear a mas,k sign papers that they were
healthy, and have business policies that ensure that employees are required to
meet certain standards. Pat Peyser asked how the Association was going to
enforce this since enforcement of rules and Bylaws seemed to be very hit or
miss. The board insisted that enforcement would be done up to and including
stopping the work. Legal Counsel Jeremy Tucker had said no building among his
clients in Friendship Heights had opened their building to outside contractors,
we would be the first. The board agreed to open the building to
outside contactors. This a position was passed by the Board.
—Acquisition
of Radio Antenna to comply with Police and Fire Communication Requirements: Bids
are being collected.
— Guidelines for Window
Cleaning and other Upkeep Services: Our GM
said the cleaners sometimes have to go into apartments to
complete their work. It was not clear what these exceptions
entailed. Board members Elisa Siegel and Francine Klein said now that
management has returned to the office, it is time to pay attention to the
building appearance and that the marble and brass and contractor should be
allowed to come in the building as long as they follow the Elizabeth’s rule on
social distance and masks and certify the health of their employees.
—Corridor
Renovation: No mention
—Meeting
Documents: President Lyle Schwartz said that the June meeting was delayed
because the Board lacked information to conduct the meeting. While there were 5
documents sent with the Zoom link for the rescheduled meeting (June 30), the
management report was not among these documents. A limited supply of management
report copies were left at the front desk. (Does this make sense in time of a
pandemic?) Documents sent included: Meeting Agenda, Investment Guidelines for
the Elizabeth Condominium Association, Recommendation for In-Unit Renovations,
Phase 2 Montgomery County Guidelines for Re-opening the Pool, Phase 2 Montgomery
County Guidelines for Re-opening the Fitness Center.
No comments:
Post a Comment