Board Present:
Lyle Schwartz (president), Zlatan Beca, Makarand (Mak) Dehejia, Francine Klein,
Elisa Siegel, Christopher Wemple
Board Absent: Jimmy
Whalen
Others Present: General Manager MaryAnn Hall(GM), Romaine Cureton, Assistant Manager (AM)
Jeremy Tucker (ECA Legal Counsel, Lerch Early & Brewer)
Meeting was called
to order at 7:30 PM
President's Report:
—Long time resident
Mary Catherine Curran died from cancer on August 23, 2020.
—Commercial units
101, 102, 103 (Montage) had police and FBI removing things from their units as
our meeting was in progress. No further information was available.
—October 7 is the
new date for our annual meeting (postponed originally from early May to September
due to coronavirus) because the company with electronic counting fell through.
Owners are asked to be sure to turn in their proxies to ensure 51%
participation. There is a monetary cost if the Association fails to get 51%
participation and is forced to reconstitute the meeting at a later time.
—Gates Hudson is
transitioning its financial software and will not be processing any of
transactions until after October 7.
—Accounting for the
detailed costs of the garage project will be presented at the next board
meeting.
—While there are
still details on a checklist being worked on, the garage project is completed
BUT some consideration is being given to an additional four-week project to
treat and paint the floor of the G4 level. Additionally work is being done to repair
the ceiling at the entrance of G1.
Important Dates:
-October 7 at 5 pm
deadline for turning in Proxy Ballot to ECA Management Office
-October 7 at 7:30 pm
Annual Meeting on Zoom
General Manager's Report
Boiler Blowout:
—For 19 hours (September
20-21), residents were without water (including inability to flush toilets) and
without heat. The noise of an expansion coupler could be heard in the lobby and
the lower floors of the West Tower. According to the GM, NAC was called to the
site that night but they failed to fix the problem because they did not have
access to the needed parts. The next day couplers on both boilers were replaced
to avoid this problem happening again. Travelers’ Insurance agents have
inspected the boilers and reported, as is required to Montgomery County, that
all meets standards. Communication about this extremely serious problem (since
residents have no options to go elsewhere during the pandemic) was delivered
late from the General Manager whose job description details 24/7 duties.
Garage Project:
—The expected
completion of the final checklist, including the ceiling repair over the
incoming G-1 garage, is October 9. However, more extensive repairs were
identified September 23, requiring that scaffolding be built to reach these
newly identified problems. (Sounds like this effort will take longer to
repair.)
—The floor of G4 is
now being considered for additional concrete crack repairs, smoothing of the
floor and application of an epoxy coating. Due to pending cold weather this
project would be put on hold until the spring. One proposal put this work at
$231,000.
—This news raises several
questions, especially given the cost. Were the cracks in the G4 there when the
original garage project was evaluated for cost? If so, why weren’t these cracks
repaired already? Since the industry doesn’t recommend treating the foundation
floor, what advantages besides aesthetics are there to preparing the floor and
then treating it with an epoxy coating? Does this epoxy coating hold up since
it is the foundation floor? There must be some reasons why the industry doesn’t
recommend doing this.
Pool Access:
—Changes to how
reservations will be handled were detailed in distributed documents.
—One disturbing
aspect of the changes was how frequently the pool area would be disinfected
(down from cleaning before each new set of users entered the pool to twice a
day).
—Another idea being
considered is bringing back water aerobics classes.
—Here are some things
to consider for the upcoming colder months: Health experts are now telling us
that six feet distance is probably not enough given that tiny particles known
as aerosols linger in the air in the same way as tobacco smoke. People who
participate in a water aerobics class would be more likely than swimmers to
spread aerosols. Wearing masks is impractical given the possibility that the
masks will get wet. Additionally, the air circulation in our pool area is not
particularly good (no cross ventilation). We haven’t had Coronavirus cases here
in the Elizabeth that we know of and we should keep it that way.
Elevators:
Inspections have been
done and elevators safety certified.
Roof Replacement:
This is on hold for
three years. One thing to know is that we cannot use the same materials we
currently have which involves some kind of stone.
Front Door Canopy:
The leaks have been
repaired.
Corridor Renovations:
Hallway assessment will
begin and residents need to remove anything they have been leaving outside
their doors such as carts, strollers, and shoes.
Lobby Climate
Control:
This project is on
hold due to Coronavirus.
Emergency Radio
Antennas:
The GM received additional
information from two bidders and will be forwarding the compiled data to the
Board.
MOTIONS
—Board voted unanimously
go forward with an additional loan paydown in mid-October after Gates Hudson
has made its transition to a new financial system.
—Board approved new
pool rules.
Meeting was adjourned
after 9 PM.